P-all consultants <strong>Staatsolie</strong> Maatschappij Suriname N.V.<br />

<strong>PESIA</strong> <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> <strong>2D</strong> <strong>Seismic</strong> 2012<br />

considered to be minor negative. Nevertheless some recommendations for prevention /<br />

minimization are presented.<br />

• select the least productive soils in the area of the seismic trails<br />

• limit earth moving and soil disturbance to the minimum<br />

• restore the site upon termination of the drilling and explosion<br />

• compensate owners for damages<br />

With these measures the impacts will be negligible both for the wetlands and the dryland areas.<br />

Table 23: Impact on geomorphology, geohydrology and soil for wet and dry land areas.<br />

Impact on:<br />

geomorphology,<br />

geohydrology<br />

and soil for wet<br />

and dryland<br />

areas<br />

Without<br />

Mitigation<br />

With mitigation<br />

measures<br />

Magnitude/<br />

Intensity<br />

/Size<br />

Geographical<br />

scale<br />

Duration Probability Severity Overall<br />

significance<br />

Low Small medium Medium Low Minor<br />

negative<br />

Low Small Short Low Low Negligible<br />

5.5 VISUAL RESOURCES, TOPOGRAPHY AND LANDSCAPE<br />

The project area is characterized by a low relief and has no prominent landscape features. The<br />

project will not involve essential alterations of landscape and topography.<br />

However, seismic trails in the Wetland Area will be visible from the air and clearing within the<br />

project area will surely draw the attention of people flying over the area. It is considered<br />

essential that the footprint of the project is limited to the minimum. A potentially moderate<br />

negative impact could arise and some prevention and mitigation measures are recommended that<br />

will result in a minor negative impact.<br />

• plan trails and explosion sites in such a way that a minimum of forest clearing is required<br />

• use only the initial trails and do not widen the trails during operation<br />

• where possible: use the already existing trails and canal (fish hole) trajectory<br />

Table 24 Impact on visual resources<br />

Impact on:<br />

visual<br />

resources<br />

Without<br />

Mitigation<br />

With<br />

Mitigation<br />

Magnitude/<br />

Intensity<br />

/Size<br />

Geographical<br />

scale<br />

Medium Small Long<br />

term<br />

Low Small Short<br />

term<br />

No impact to the visual resources will occur in the Dry land Area.<br />

Duration Probability Severity Overall<br />

significance<br />

73<br />

High medium Moderate<br />

negative<br />

Medium Low Minor<br />

negative