14.09.2013 Views

(PESIA) Weg naar Zee 2D Seismic - Staatsolie

(PESIA) Weg naar Zee 2D Seismic - Staatsolie

(PESIA) Weg naar Zee 2D Seismic - Staatsolie

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

P-all consultants <strong>Staatsolie</strong> Maatschappij Suriname N.V.<br />

<strong>PESIA</strong> <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> <strong>2D</strong> <strong>Seismic</strong> 2012<br />

Annex 1.<br />

Information about P-all and the consultants<br />

P-all<br />

P-all has more than 15 years experience. P-all has knowledge and experience in the field of ESIA<br />

studies. P-all has successful working relations with NIMOS and on working on ESIA’s in the<br />

formats of NIMOS and the formats of international finance institutions.<br />

P-all has direct access to geographical, planning, commercial/economical and legislative<br />

knowledge and knowhow. Because of strategic cooperation with other companies, P-all also has<br />

access to more or less all the required fields of expertise.<br />

Amongst others recent ESIA’s and ESIA related studies have been conducted related to:<br />

a. The Berg en Dal Eco and Cultural River Resort. This study was done in a successful the<br />

IADB. IADB is co-financer of the project. 2008. NIMOS reviewed the study.<br />

b. The Rehabilitation of the East-West road from Meerzorg to Albina. This ESIA was done<br />

successful in NIMOS format and complied with the formats of the financers: IADB and<br />

European Union. 2009. NIMOS reviewed the study.<br />

c. Improvement of the Social and Economic conditions in the corridor of the road<br />

Meerzorg-Albina on the basis of the ESIA mentioned under b.<br />

d. ESIA study for the extension of the Zorg en Hoop airstrip for the Ministry of PLOS.<br />

e. Preliminary ESIA study of the bridge over the Suriname River between Carolina and<br />

Redidoti. Prepared in NIMOS format and accepted as base document by INGBank. 2011.<br />

f. Feasibility study of the road from Pokigron/Atjoni to Pusugrunu for the Ministry of<br />

Works. 2010.<br />

g. Studies for the National Biodiversity Action Plan and the National Climate Action Plan.<br />

2011.<br />

P-all has excellent track records with regard to the conducting of stakeholders meetings and<br />

communication. Some examples are:<br />

a. Facilitator for the formulation of the Forest Policy document of Suriname, financed by<br />

the IADB.<br />

b. Organize and facilitate stakeholder meetings with tribal communities related to the<br />

establishment and/or management of nature reserves: Apura, Washabo, Kwamalasamutu,<br />

Bigi Poika, Witagron, etc.<br />

c. Stakeholders’ consultation processes for above mentioned <strong>PESIA</strong> studies.<br />

d. Stakeholders meetings related to the ‘Improvement of the airports of the interior’ with all<br />

relevant local communities.<br />

e. Development of communication plans for <strong>Staatsolie</strong> for the projects: ‘TapaJay’ and<br />

‘Wageningen Bio fuel’.<br />

f. Facilitate stakeholder meetings of Paradise Oil in the Commewijne District, related to the<br />

3D seismic.<br />

98

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!