(PESIA) Weg naar Zee 2D Seismic - Staatsolie
(PESIA) Weg naar Zee 2D Seismic - Staatsolie
(PESIA) Weg naar Zee 2D Seismic - Staatsolie
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
P-all consultants <strong>Staatsolie</strong> Maatschappij Suriname N.V.<br />
<strong>PESIA</strong> <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> <strong>2D</strong> <strong>Seismic</strong> 2012<br />
Annex 1.<br />
Information about P-all and the consultants<br />
P-all<br />
P-all has more than 15 years experience. P-all has knowledge and experience in the field of ESIA<br />
studies. P-all has successful working relations with NIMOS and on working on ESIA’s in the<br />
formats of NIMOS and the formats of international finance institutions.<br />
P-all has direct access to geographical, planning, commercial/economical and legislative<br />
knowledge and knowhow. Because of strategic cooperation with other companies, P-all also has<br />
access to more or less all the required fields of expertise.<br />
Amongst others recent ESIA’s and ESIA related studies have been conducted related to:<br />
a. The Berg en Dal Eco and Cultural River Resort. This study was done in a successful the<br />
IADB. IADB is co-financer of the project. 2008. NIMOS reviewed the study.<br />
b. The Rehabilitation of the East-West road from Meerzorg to Albina. This ESIA was done<br />
successful in NIMOS format and complied with the formats of the financers: IADB and<br />
European Union. 2009. NIMOS reviewed the study.<br />
c. Improvement of the Social and Economic conditions in the corridor of the road<br />
Meerzorg-Albina on the basis of the ESIA mentioned under b.<br />
d. ESIA study for the extension of the Zorg en Hoop airstrip for the Ministry of PLOS.<br />
e. Preliminary ESIA study of the bridge over the Suriname River between Carolina and<br />
Redidoti. Prepared in NIMOS format and accepted as base document by INGBank. 2011.<br />
f. Feasibility study of the road from Pokigron/Atjoni to Pusugrunu for the Ministry of<br />
Works. 2010.<br />
g. Studies for the National Biodiversity Action Plan and the National Climate Action Plan.<br />
2011.<br />
P-all has excellent track records with regard to the conducting of stakeholders meetings and<br />
communication. Some examples are:<br />
a. Facilitator for the formulation of the Forest Policy document of Suriname, financed by<br />
the IADB.<br />
b. Organize and facilitate stakeholder meetings with tribal communities related to the<br />
establishment and/or management of nature reserves: Apura, Washabo, Kwamalasamutu,<br />
Bigi Poika, Witagron, etc.<br />
c. Stakeholders’ consultation processes for above mentioned <strong>PESIA</strong> studies.<br />
d. Stakeholders meetings related to the ‘Improvement of the airports of the interior’ with all<br />
relevant local communities.<br />
e. Development of communication plans for <strong>Staatsolie</strong> for the projects: ‘TapaJay’ and<br />
‘Wageningen Bio fuel’.<br />
f. Facilitate stakeholder meetings of Paradise Oil in the Commewijne District, related to the<br />
3D seismic.<br />
98