(PESIA) Weg naar Zee 2D Seismic - Staatsolie
(PESIA) Weg naar Zee 2D Seismic - Staatsolie
(PESIA) Weg naar Zee 2D Seismic - Staatsolie
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
P-all consultants <strong>Staatsolie</strong> Maatschappij Suriname N.V.<br />
<strong>PESIA</strong> <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> <strong>2D</strong> <strong>Seismic</strong> 2012<br />
(Potential)<br />
impacts arranged<br />
according to<br />
environmental<br />
component<br />
Contamination of<br />
water in fish holes<br />
could result in a<br />
lower swamp fish<br />
catch. Wetland.<br />
Damage to canals,<br />
trenches, dams.<br />
Wet and dry land.<br />
Construction of<br />
access ways<br />
through canals,<br />
trenches, dams and<br />
fences<br />
Construction of<br />
seismic lines on<br />
farmland or<br />
residential area<br />
may result in loss<br />
of the standing<br />
crop, soil<br />
compaction and<br />
other disturbances<br />
Significance<br />
without<br />
mitigation<br />
Mitigation<br />
Measures<br />
P O C<br />
2 2 2 No prevention or mitigation<br />
measures required: impact is at a<br />
small scale and very temporary<br />
2 2 2 Involve local people and keep an<br />
open dialogue during all phases of<br />
the project<br />
Minimize damage to structures , also<br />
when this requires a longer route<br />
Repair immediately after finalization<br />
2 2 2 Involve local people and keep an<br />
open dialogue during all phases of<br />
the project so improvements can<br />
benefit and sustain their activities<br />
2 2 2 Involve local people and keep an<br />
open dialogue during all phases of<br />
the project<br />
Do not drill explosion holes near<br />
houses<br />
119<br />
Significance<br />
with<br />
mitigation<br />
3<br />
3<br />
3<br />
3