14.09.2013 Views

(PESIA) Weg naar Zee 2D Seismic - Staatsolie

(PESIA) Weg naar Zee 2D Seismic - Staatsolie

(PESIA) Weg naar Zee 2D Seismic - Staatsolie

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

P-all consultants <strong>Staatsolie</strong> Maatschappij Suriname N.V.<br />

<strong>PESIA</strong> <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> <strong>2D</strong> <strong>Seismic</strong> 2012<br />

• involve the local people and keep an open dialogue during all phases of the project<br />

• minimize damage to structures, also when this requires a longer route<br />

• repair immediately after finalization<br />

With the mitigation measures in place the impact will be minor.<br />

Table 36: Damage on use of existing infrastructure<br />

Damage on<br />

use of<br />

existing<br />

infrastructure<br />

Without<br />

Mitigation<br />

With<br />

Mitigation<br />

Magnitude/<br />

Intensity<br />

/Size<br />

Geographical<br />

scale<br />

Medium Small Long<br />

term<br />

Low Small Short<br />

term<br />

Duration Probability Severity Overall<br />

significance<br />

84<br />

High Medium Moderate<br />

negative<br />

Medium Low Minor<br />

negative<br />

A potential positive impact to land use is the construction of access ways that go through canals,<br />

trenches, dams and fences in the Polder <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> area, and dams along canals and fish holes<br />

(Eastern Wayambo Swamp). The farmers and owners can benefit from the improvement of their<br />

infrastructure.<br />

The impact is considered as to be minor positive. Yet one enhancing measure is recommended<br />

that can increase the impact to moderate positive.<br />

• involve the local people and keep an open dialogue during phases of the seismic project<br />

so improvements can benefit and sustain their activities.<br />

Table 37 Impact of infrastructure improvement in wetland<br />

Impact of<br />

infrastructure<br />

improvement<br />

in wetland<br />

Without<br />

Mitigation<br />

With<br />

Mitigation<br />

Dry land Area:<br />

Magnitude/<br />

Intensity<br />

/Size<br />

Geographical<br />

scale<br />

Low Medium Short<br />

term<br />

Medium Medium Long<br />

term<br />

Duration Probability Severity Overall<br />

significance<br />

Low low Minor<br />

positive<br />

High Medium Moderate<br />

positive<br />

A couple of the seismic lines, line WNZ-<strong>2D</strong>-20011/001, WNZ-<strong>2D</strong>-20011/003, WNZ-<strong>2D</strong>-<br />

20011/004, WNZ-<strong>2D</strong>-20011/005 cross dry land area where horticulture and/or housing<br />

development are evident. Some of the farms may also have a water reservoir and/or a smaller or<br />

larger fish or duck pond in its neighborhood.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!