P-all consultants <strong>Staatsolie</strong> Maatschappij Suriname N.V.<br />
<strong>PESIA</strong> <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> <strong>2D</strong> <strong>Seismic</strong> 2012<br />
• involve the local people and keep an open dialogue during all phases of the project<br />
• minimize damage to structures, also when this requires a longer route<br />
• repair immediately after finalization<br />
With the mitigation measures in place the impact will be minor.<br />
Table 36: Damage on use of existing infrastructure<br />
Damage on<br />
use of<br />
existing<br />
infrastructure<br />
Without<br />
Mitigation<br />
With<br />
Mitigation<br />
Magnitude/<br />
Intensity<br />
/Size<br />
Geographical<br />
scale<br />
Medium Small Long<br />
term<br />
Low Small Short<br />
term<br />
Duration Probability Severity Overall<br />
significance<br />
84<br />
High Medium Moderate<br />
negative<br />
Medium Low Minor<br />
negative<br />
A potential positive impact to land use is the construction of access ways that go through canals,<br />
trenches, dams and fences in the Polder <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> area, and dams along canals and fish holes<br />
(Eastern Wayambo Swamp). The farmers and owners can benefit from the improvement of their<br />
infrastructure.<br />
The impact is considered as to be minor positive. Yet one enhancing measure is recommended<br />
that can increase the impact to moderate positive.<br />
• involve the local people and keep an open dialogue during phases of the seismic project<br />
so improvements can benefit and sustain their activities.<br />
Table 37 Impact of infrastructure improvement in wetland<br />
Impact of<br />
infrastructure<br />
improvement<br />
in wetland<br />
Without<br />
Mitigation<br />
With<br />
Mitigation<br />
Dry land Area:<br />
Magnitude/<br />
Intensity<br />
/Size<br />
Geographical<br />
scale<br />
Low Medium Short<br />
term<br />
Medium Medium Long<br />
term<br />
Duration Probability Severity Overall<br />
significance<br />
Low low Minor<br />
positive<br />
High Medium Moderate<br />
positive<br />
A couple of the seismic lines, line WNZ-<strong>2D</strong>-20011/001, WNZ-<strong>2D</strong>-20011/003, WNZ-<strong>2D</strong>-<br />
20011/004, WNZ-<strong>2D</strong>-20011/005 cross dry land area where horticulture and/or housing<br />
development are evident. Some of the farms may also have a water reservoir and/or a smaller or<br />
larger fish or duck pond in its neighborhood.