14.09.2013 Views

(PESIA) Weg naar Zee 2D Seismic - Staatsolie

(PESIA) Weg naar Zee 2D Seismic - Staatsolie

(PESIA) Weg naar Zee 2D Seismic - Staatsolie

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

P-all consultants <strong>Staatsolie</strong> Maatschappij Suriname N.V.<br />

<strong>PESIA</strong> <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> <strong>2D</strong> <strong>Seismic</strong> 2012<br />

Figure 6: The data is recorded in a central recording unit, commonly a small cabin either placed<br />

on the ground or on a small truck. The recorded data is immediately displayed and checked in the<br />

field. If the data quality is poor, it is re-shot.<br />

After the survey is complete, the shot-holes are closed and the environment is cleaned up.<br />

The project will take about 3 months of data acquisition. All the geophysical equipment will be<br />

shipped into Paramaribo by the contractor. The contractor will need to establish a base in<br />

Paramaribo. Most probably cars, trucks and boats will be used for the field activities. Prior to<br />

acquisition startup, the relevant authorities will be allowed to audit equipment, equipment setup<br />

and personnel for certification and safety.<br />

3.4.3 DECOMMISSIONING PHASE<br />

• Equipment will be dismantled and trails abandoned according to international standards<br />

for the oil and gas industry. All necessary activities will be executed to prevent<br />

contamination of soil, ground- and surface water.<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!