(PESIA) Weg naar Zee 2D Seismic - Staatsolie
(PESIA) Weg naar Zee 2D Seismic - Staatsolie
(PESIA) Weg naar Zee 2D Seismic - Staatsolie
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
P-all consultants <strong>Staatsolie</strong> Maatschappij Suriname N.V.<br />
<strong>PESIA</strong> <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> <strong>2D</strong> <strong>Seismic</strong> 2012<br />
Figure 6: The data is recorded in a central recording unit, commonly a small cabin either placed<br />
on the ground or on a small truck. The recorded data is immediately displayed and checked in the<br />
field. If the data quality is poor, it is re-shot.<br />
After the survey is complete, the shot-holes are closed and the environment is cleaned up.<br />
The project will take about 3 months of data acquisition. All the geophysical equipment will be<br />
shipped into Paramaribo by the contractor. The contractor will need to establish a base in<br />
Paramaribo. Most probably cars, trucks and boats will be used for the field activities. Prior to<br />
acquisition startup, the relevant authorities will be allowed to audit equipment, equipment setup<br />
and personnel for certification and safety.<br />
3.4.3 DECOMMISSIONING PHASE<br />
• Equipment will be dismantled and trails abandoned according to international standards<br />
for the oil and gas industry. All necessary activities will be executed to prevent<br />
contamination of soil, ground- and surface water.<br />
30