P-all consultants <strong>Staatsolie</strong> Maatschappij Suriname N.V.<br />
<strong>PESIA</strong> <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> <strong>2D</strong> <strong>Seismic</strong> 2012<br />
5.7 WATER QUALITY<br />
Wetland Area<br />
Impacts of the project to water quality could be brought about by the following project activities:<br />
Construction phase:<br />
During the construction of trails and during equipment moving some turbidity may arise in the<br />
swamps and the fish holes. The increased level of suspended solids is considered to be a minor<br />
negative to negligible impact at most, being localized and short-lived; no mitigation is required.<br />
Operation phase:<br />
The on-site release of drilling waste of the explosion holes will change the water quality in the<br />
swamp surrounding the explosion holes. Turbidity caused by released mud may harm aquatic<br />
life, but salinity is not thought to be a factor given the very shallow explosion holes.<br />
The main impact being a temporary and much localized increase of turbidity. Therefore the<br />
impact of the on-site release of drilling waste in the environment is considered as to be minor<br />
negative. Mitigation will be to avoid releasing drilling waste into surface water. With this<br />
measure the impact will be negligible.<br />
Operation phase:<br />
Minor quantities of soil may be released from explosion holes during explosions. The impact, if<br />
any, will generally be very low, as it will affect only a very small area and it will be contained by<br />
the surrounding vegetation and peat. The impact is therefore considered negligible. Water<br />
quality measurements are conducted both in the swamp area and in the canal in the Dry land<br />
(Brantimakaweg) area to determine the water quality base-line.<br />
All phases:<br />
Solid and sanitary waste is being produced during all project phases. It could contribute to water<br />
pollution. The potential impact, being of low magnitude, low probability and very localized, is<br />
considered to be minor negative and will become negligible if <strong>Staatsolie</strong> General Field<br />
Instructions are implemented. Measures are already in place as part of the <strong>Staatsolie</strong> waste<br />
management procedures.<br />