14.09.2013 Views

(PESIA) Weg naar Zee 2D Seismic - Staatsolie

(PESIA) Weg naar Zee 2D Seismic - Staatsolie

(PESIA) Weg naar Zee 2D Seismic - Staatsolie

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

P-all consultants <strong>Staatsolie</strong> Maatschappij Suriname N.V.<br />

<strong>PESIA</strong> <strong>Weg</strong> <strong>naar</strong> <strong>Zee</strong> <strong>2D</strong> <strong>Seismic</strong> 2012<br />

Figure 1: Line preparation by hand clearing: trails of approximately 1 m wide are cut open using<br />

machetes and chain saws to cut the vegetation in order to gain access to the shot points and<br />

receiver points.<br />

Figure 2: For difficult to reach areas, such as dense jungle, fly camps are being build. The above<br />

pictures shows floating platforms as a basis for the fly camps. These platforms are placed by use<br />

of helicopters. Airboats will be employed for transport in certain swamp areas, which will<br />

require the construction of airboat trails. For transport to and from the camps boats or cars will<br />

be used, depending on the conditions.<br />

Figure 3: The shot holes are drilled by portable motorized drills. Approximately 3” holes will be<br />

drilled till 6 – 10 m depth every 10 – 40 m. Water for the drilling process is supplied by a small<br />

water pump.<br />

28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!