28.02.2014 Views

sPeCIAL ArABAL - ALUMINIUM-Nachrichten – ALU-WEB.DE

sPeCIAL ArABAL - ALUMINIUM-Nachrichten – ALU-WEB.DE

sPeCIAL ArABAL - ALUMINIUM-Nachrichten – ALU-WEB.DE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>sPeCIAL</strong> <strong>ArABAL</strong><br />

<strong><strong>ALU</strong>MINIUM</strong> INdUstry IN the GULf<br />

© Bechtel<br />

Construction work at the Ma’aden-Alcoa joint venture early this year, with Bechtel the EPCM contractor.<br />

From left to right: field engineers Fadi Elmourad, Muthukumaran Kuppusamy, Mohamad El Samad and<br />

planner Lamont Berry.<br />

Fluor Corporation’s Greenville, South Carolina<br />

office is elaborating a design and procurement<br />

contract awarded by the aforementioned<br />

Ma’aden-Alcoa joint venture to build an integrated<br />

automotive sheet manufacturing plant<br />

that forms part of the aluminium complex.<br />

The scope of Fluor’s work will include design,<br />

construction and commissioning of the plant,<br />

which will have the capability to produce a<br />

range of products suitable for further downstream<br />

manufacturing in the aluminium complex.<br />

Once complete, the automotive sheet facility<br />

will produce lightweight aluminium to be<br />

used in vehicle manufacturing. These products<br />

will include automotive heat-treated and nonheat-treated<br />

sheet, building and construction<br />

sheet, and foil stock. “This new manufacturing<br />

facility will help meet the global automotive<br />

industry’s growing demands for new, lighter<br />

materials,” said Fluor head of Mining & Metals<br />

business Rick Koumouris.<br />

experience in the region having operated as<br />

the EPCM contractor for the previous Line<br />

4 and 5 expansions. The BFS is expected to<br />

be completed by the third quarter this year,<br />

and Alba projects that the new line could be<br />

completed by early 2015. Alongside Bechtel,<br />

BNP Paribas is acting as the financial adviser<br />

for the project.<br />

further ePCM projects<br />

HRV Engineering / Hatch: In Iceland, Rio<br />

Tinto Alcan is updating equipment, increas-<br />

ANO<strong>DE</strong> BAKING FACILITIES<br />

The Riedhammer anode baking facility is a key component in a modern<br />

anode production plant. Our plants offer many advantages such as:<br />

• Customised design<br />

• Excellent anode quality<br />

• Extended furnace lifetime<br />

• Low energy consumption<br />

• High productivity<br />

• Flexible equipment supply<br />

• Safe operation<br />

RIEDHAMMER<br />

CARBON BAKING TECHNOLOGY<br />

RIEDHAMMER GmbH<br />

Klingenhofstraße 72<br />

90411 Nürnberg<br />

Phone: +49 911 5218 0<br />

Fax: +49 911 5218 231<br />

www.riedhammer.de

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!