15.05.2014 Views

Complete report - Partners for Clean Streams

Complete report - Partners for Clean Streams

Complete report - Partners for Clean Streams

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The impact study determined that these projects would significantly improve dissolved<br />

oxygen, aesthetics, and bacteria levels in the Ottawa River. However, due to other<br />

influences such as contaminated sediment, upstream loads, and degraded habitat,<br />

water quality standards would mostly likely continue to be exceeded.<br />

Lead Organization:<br />

City of Toledo Department of Public Utilities<br />

Sanitary Sewer Overflow Abatement<br />

1998-2001<br />

Description:<br />

Lead Organization:<br />

The City of Toledo is under Findings and Orders from Ohio EPA to eliminate three<br />

SSOs (pump stations at 129 th and Edgewater, 145 th and Edgewater, and 290 th and<br />

Ottawa River Road). At the time of <strong>report</strong> preparation, Phase I of the<br />

recommendations in the 1997 <strong>report</strong> is completed. They include the construction of<br />

the Point Place Relief Pump Station in Detwiler Park at Manhattan Boulevard and<br />

Summit Street, sewer repairs to eliminate 32 cross-sections between storm and<br />

sanitary sewers, and cleaning and televising of all of the sewers in Point Place.<br />

City of Toledo Department of Public Utilities<br />

Flow Characterization and Water Quality Study<br />

2001<br />

Description:<br />

Lead Organization:<br />

The City of Toledo is currently completing this study in preparation of a Long Term<br />

Control Plan <strong>for</strong> EPA. This study included hydraulic modeling, stream sampling,<br />

macro-invertebrate testing, fish surveys, CSO sampling, WWTP bypass sampling,<br />

and the development of a computer model to assess the impact of CSOs on the<br />

Maumee River, the Ottawa River and Swan Creek. Early <strong>report</strong>s indicate that<br />

sediment oxygen demand may be a major factor in stream oxygen depletion.<br />

Pollutants of concern from CSOs appear to be dissolved oxygen, ammonia, fecal<br />

coli<strong>for</strong>m, mercury, cyanide, lead, copper, zinc and silver.<br />

City of Toledo Department of Public Utilities<br />

Other Areas<br />

City of Maumee CSO Abatement<br />

1988-1997<br />

Description: In four phases, Maumee separated its sewers and eliminated its CSOs by 1997.<br />

As of 2001 the entire City of Maumee has separate sewers except two small<br />

areas: Old Trail Road (approximately 12 houses) and Valley Drive (approximately 6<br />

houses).<br />

Lead Organization:<br />

City of Maumee<br />

City of Perrysburg CSO Abatement<br />

1988-Present<br />

Activities and Accomplishments<br />

in the Maumee Area of Concern<br />

180<br />

Issue 6: Combined<br />

Sewer Overflows

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!