2001-2003<br />

Description:<br />

The Reno Beach/Bono/Howard Farms sewer project is scheduled <strong>for</strong> construction in<br />

three phases between 2001 and 2003 at a total cost of about $11 million. These<br />

unincorporated communities in eastern Jerusalem Township consist of about 500<br />

homes, of which about 400 will be sewered. This portion of the project will be built by<br />

Lucas County and will connect to the Oregon WWTP. The Oregon portion of this<br />

project will include gravity sanitary sewers along Seaman Road as far east as Wolf<br />

Creek, and will make sewers available on some side roads as well. This sewer line<br />

will eliminate four or five package plants and many septic systems.<br />

Activities and Accomplishments<br />

in the Maumee Area of Concern<br />

201<br />

Issue 11: Wastewater<br />