- Page 1: ACTIVITIES AND ACCOMPLISHMENTS IN T
- Page 5: ACKNOWLEDGEMENTS Thanks to the hund
- Page 8 and 9: Activities and Accomplishments in t
- Page 10 and 11: the many Maumee RAP partners in the
- Page 12 and 13: eflect the number located to the le
- Page 14 and 15: Activities and Accomplishments in t
- Page 16 and 17: Actions Suggested in the Maumee RAP
- Page 18 and 19: Actions Suggested in the Maumee RAP
- Page 20 and 21: Actions Suggested in the Maumee RAP
- Page 22 and 23: ISSUE 3: WETLANDS AND OPEN SPACE PR
- Page 24 and 25: ISSUE 4: URBAN RUNOFF PROBLEM (cont
- Page 26 and 27: ISSUE 4: URBAN RUNOFF PROBLEM (cont
- Page 28 and 29: Actions Suggested in the Maumee RAP
- Page 32 and 33: Activities and Accomplishments in t
- Page 34 and 35: ISSUE 6: COMBINED SEWER OVERFLOWS (
- Page 36 and 37: ISSUE 7: ACQUISITION OF FISH AND WI
- Page 38 and 39: ISSUE 8: CONTAMINATED STREAM SEDIME
- Page 40 and 41: Activities and Accomplishments in t
- Page 42 and 43: Actions Suggested in the Maumee RAP
- Page 44 and 45: ISSUE 10: INDUSTRIAL DISCHARGERS (c
- Page 46 and 47: ISSUE 11: WASTEWATER TREATMENT PLAN
- Page 48 and 49: Actions Suggested in the Maumee RAP
- Page 50 and 51: Activities and Accomplishments in t
- Page 52 and 53: ISSUE 14: ATMOSPHERIC DEPOSITION (c
- Page 54 and 55: Activities and Accomplishments in t
- Page 56 and 57: Activities and Accomplishments in t
- Page 58 and 59: Activities and Accomplishments in t
- Page 60 and 61: Activities and Accomplishments in t
- Page 62 and 63: Activities and Accomplishments in t
- Page 64 and 65: Actions Suggested in the Maumee RAP
- Page 66 and 67: ISSUE 21: COMPREHENSIVE WILDLIFE HA
- Page 68 and 69: ISSUE 22: COORDINATING COMMITTEE AN
- Page 70 and 71: ISSUE 23: LONG-TERM MONITORING OF A
- Page 72 and 73: Activities and Accomplishments in t
- Page 74 and 75: Activities and Accomplishments in t
- Page 76 and 77: Lead Organization: Collaborator(s):
- Page 78 and 79: Residue Management & Erosion Contro
- Page 80 and 81:
filter strips and wildlife habitat.
- Page 82 and 83:
y planting a record 104 miles of tr
- Page 84 and 85:
Watershed Project participants, Kro
- Page 86 and 87:
Activities and Accomplishments in t
- Page 88 and 89:
(1984) In 1984, a sampling program
- Page 90 and 91:
Collaborator(s): Ohio EPA Millard A
- Page 92 and 93:
Site Investigation (1987) On Novemb
- Page 94 and 95:
Inland Chemical (Ash Street, Toledo
- Page 96 and 97:
(2000) In January 2000, Parsons Eng
- Page 98 and 99:
Unitcast (1440 East Broadway, Toled
- Page 100 and 101:
Site Investigation (1989-1995) The
- Page 102 and 103:
American Motors Company in 1987. Th
- Page 104 and 105:
An interim leachate collection syst
- Page 106 and 107:
leaching hydrocarbons into the cree
- Page 108 and 109:
A parcel of radioactive material wa
- Page 110 and 111:
Plant. Lead Organization: Collabora
- Page 112 and 113:
Site History: Northeast of Beatty P
- Page 114 and 115:
Under a cooperative agreement with
- Page 116 and 117:
Treasure Island Landfill (between N
- Page 118 and 119:
approved on September 14, 1995. Rem
- Page 120 and 121:
soils were sampled and found to inc
- Page 122 and 123:
Commercial Oil (3600 Cedar Point Ro
- Page 124 and 125:
Site History: At one time tributari
- Page 126 and 127:
evidence of significant contaminati
- Page 128 and 129:
expected to flow towards Swan Creek
- Page 130 and 131:
contaminant pathway was identified
- Page 132 and 133:
In February 1996 a site assessment
- Page 134 and 135:
Site Investigation (1993) Following
- Page 136 and 137:
This site is under Administrative O
- Page 138 and 139:
(1997) In 1997 the Spencer Township
- Page 140 and 141:
Other Area Watersheds Dial Corporat
- Page 142 and 143:
Jerusalem Township Dump (11670 Stat
- Page 144 and 145:
Clean Ohio Fund 2001-2005 Descripti
- Page 146 and 147:
Waterbank Program 1992-1994 Descrip
- Page 148 and 149:
Army Corps of Engineers and New Ohi
- Page 150 and 151:
OSU Drainage Channel Restoration Pr
- Page 152 and 153:
EPA on sites of 5 acres or greater
- Page 154 and 155:
Several municipalities have floodpl
- Page 156 and 157:
contracts with private waste manage
- Page 158 and 159:
incorporated in the casting of the
- Page 160 and 161:
Description: Ohio EPA staff are ava
- Page 162 and 163:
Plan of Operation for a Regional St
- Page 164 and 165:
management needs. The Toledo Storm
- Page 166 and 167:
10 presentations are given annually
- Page 168 and 169:
NGOs the chance to discuss pressing
- Page 170 and 171:
Maumee RAP awareness among communit
- Page 172 and 173:
Maumee RAP Public Service Announcem
- Page 174 and 175:
Lead Organization: Collaborator(s):
- Page 176 and 177:
Collaborator(s): Maumee RAP Public
- Page 178 and 179:
Lake Erie Protection and Restoratio
- Page 180 and 181:
Lead Organization: Collaborator(s):
- Page 182 and 183:
Action Group Oak Openings Natives N
- Page 184 and 185:
Project Wild (Ongoing) This program
- Page 186 and 187:
area (as recommended in the Point P
- Page 188 and 189:
Description: Lead Organization: In
- Page 190 and 191:
Oak Openings Native Plant Project 1
- Page 192 and 193:
Land Manager Restoration Efforts On
- Page 194 and 195:
prioritized areas for remediation i
- Page 196 and 197:
Activities and Accomplishments in t
- Page 198 and 199:
provide the time necessary to ident
- Page 200 and 201:
the navigational dredging project a
- Page 202 and 203:
• Review of site geologic informa
- Page 204 and 205:
system in 1987. This program has de
- Page 206 and 207:
1991-Present Description: The Orego
- Page 208 and 209:
2001-2003 Description: The Reno Bea
- Page 210 and 211:
Package Plant Inspections Ongoing D
- Page 212 and 213:
also added rip rap and plantings up
- Page 214 and 215:
Swan Creek Tour Boat Landing 1998 -
- Page 216 and 217:
Great Lakes Program (GLP) Founded b
- Page 218 and 219:
Activities and Accomplishments in t
- Page 220 and 221:
Activities and Accomplishments in t
- Page 222 and 223:
fertilizer manufacturer, S & L Fert
- Page 224 and 225:
level. The council of Great Lake Go
- Page 226 and 227:
Tank Corrosion Upgrade The protecti
- Page 228 and 229:
except in an emergency situation su
- Page 230 and 231:
Description: Lead Organization: Nea
- Page 232 and 233:
plans for each Metropark. Ohio DNR
- Page 234 and 235:
include Turtle Creek, Packer Creek
- Page 236 and 237:
created to identify many of the kno
- Page 238 and 239:
and other overhead expenses. Maumee
- Page 240 and 241:
Heidelberg College Monitoring 1970-
- Page 242 and 243:
Collaborator(s): Maumee RAP Sedimen
- Page 244 and 245:
Ottawa River Geographic Initiative
- Page 246 and 247:
Activities and Accomplishments in t
- Page 248 and 249:
Activities and Accomplishments in t
- Page 250 and 251:
Activities and Accomplishments in t
- Page 252 and 253:
761 Berdan Ave., Toledo, Ohio 43610
- Page 254 and 255:
Toledo Office Phone: (419)213-4254
- Page 256 and 257:
Business BP Oil Phone: (419)698-620
- Page 258 and 259:
P.O. Box 183, Holland, Ohio 43528 F
- Page 260 and 261:
Appendix B - Index of Acronyms This
- Page 262 and 263:
PAH PCB PRP PTI Polyaromatic Hydroc