28.06.2014 Views

Learning by Doing: CISCO Certified Network ... - SCN Research

Learning by Doing: CISCO Certified Network ... - SCN Research

Learning by Doing: CISCO Certified Network ... - SCN Research

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Whole Enchilada/Crazy Insano Lab #1 (WECIL): Switching<br />

Objective:<br />

To put all or most of the concepts together into one large lab. In this lab we will be<br />

simulating a school with 3 rooms using VLANs and STP.<br />

Tools and Materials:<br />

(5) <strong>CISCO</strong> switches (1900 series)<br />

(6) straight-through cables (st)<br />

(6) Windows PC workstations with Hyperterminal and Ethereal installed<br />

(1) console cable<br />

(10) Crossover cables (xo)<br />

Lab Diagram:<br />

Teachers<br />

Students<br />

Master<br />

Master<br />

VLAN 2 VLAN 3<br />

Room 101 102 103<br />

VLAN2 VLAN 3 VLAN2 VLAN 3 VLAN2 VLAN 3<br />

Step-By-Step Instructions:<br />

1. Devise an IP addressing scheme for the network shown. Be sure to include<br />

subnet masks and gateways for devices. Include an MDF/IDF drawing and a<br />

Hierarchical design drawing.<br />

2. Cable the lab as shown.<br />

3. All VLAN 2 devices should have communication to all VLAN 2 devices only.<br />

4. Test your redundant lines for VLAN 2.<br />

5. All VLAN 3 devices should have communication to all VLAN 3 devices only.<br />

6. Test your redundant lines for VLAN 3.<br />

7. Add redundant lines in between the individual room switches and the master<br />

VLAN switches.<br />

275

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!