28.06.2014 Views

Learning by Doing: CISCO Certified Network ... - SCN Research

Learning by Doing: CISCO Certified Network ... - SCN Research

Learning by Doing: CISCO Certified Network ... - SCN Research

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Whole Enchilada/Crazy Insano Lab #2 (WECIL): Switching<br />

Objective:<br />

To put all or most of the concepts together into one large lab. In this lab we will be<br />

simulating a school with 3 rooms using VLANs and STP.<br />

Tools and Materials:<br />

(5) <strong>CISCO</strong> switches (1900 series)<br />

(8) straight-through cables (st)<br />

(6) Windows PC workstations with Hyperterminal and Ethereal installed<br />

(1) console cable<br />

(10) Crossover cables (xo)<br />

(1) Router<br />

Lab Diagram:<br />

Teachers<br />

Students<br />

Master<br />

Master<br />

VLAN 2 VLAN 3<br />

Room 101 102 103<br />

VLAN2 VLAN 3 VLAN2 VLAN 3 VLAN2 VLAN 3<br />

Step-By-Step Instructions:<br />

1. In this lab we will do the same lab but add a router to the mix. How does that<br />

change your IP addressing scheme? So the next time you design a switching<br />

network that may include routers in the future how would you design the IP<br />

scheme. Redraw your network.<br />

2. All VLAN 2 devices should have communication to all devices.<br />

3. Test your redundant lines for VLAN 2.<br />

4. All VLAN 3 devices should have communication to all devices.<br />

5. Test your redundant lines for VLAN 3.<br />

6. Add redundant lines in between the individual room switches and the master<br />

VLAN switches.<br />

276

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!