patrice(config)#int bri0/0<br />

patrice(config-if)#dialer idle-timeout 20<br />

patrice(config-if)#dialer wait-for-carrier-time 10<br />

patrice(config)#ip route 2.0.0.0 255.0.0.0 10.0.0.2 150<br />

williams(config)#int bri0/0<br />

williams(config-if)#dialer idle-timeout 20<br />

williams(config)#ip route 1.0.0.0 255.0.0.0 10.0.0.1 150<br />

11. Reconnect the frame relay network. Trace the route to the loopback on<br />

williams. You should see:<br />

patrice#traceroute 2.2.2.2<br />

Type escape sequence to abort.<br />

Tracing the route to 2.2.2.2<br />

1 williams (192.168.1.2) 32 msec * 28 msec<br />

patrice#<br />

Notice how we are getting to the loopback through the frame relay network. Now<br />

let’s unplug the frame line on patrice (to simulate a network failure) and re-trace<br />

route to our loopback again. We expect to see it route through the ISDN network<br />

(10.0.0.2) after it comes up.<br />

patrice#traceroute 2.2.2.2<br />

Type escape sequence to abort.<br />

Tracing the route to 2.2.2.2<br />

1 10.0.0.2 16 msec 16 msec *<br />

patrice#<br />

Challenge Lab or Supplemental Activities:<br />

1. Add PPP as an encapsulation. Use PAP or CHAP for authentication.<br />

2. Switch address schemes to a pure Class “B” network.<br />

3. There are many ways to perform backups: using dynamic floating routes, static routes<br />

with “backup” commands, etc. Try repeating this lab using different techniques.<br />

4. Which works best and why? Did I use it here or mix it up?<br />

5. Try this lab a bit differently: main ISDN with frame relay backup.<br />

6. Try this lab a bit differently: main ISDN with ISDN backup.<br />

7. Try this lab a bit differently: main frame Relay with frame relay backup.<br />

8. If you have the equipment, then go back and forth between ADTRAN’s and MERGE<br />

boxes for ISDN and back and forth between routers and ADTRAN’s for frame relay.<br />