20.10.2014 Views

Latin America; in English (pdf) - Transboundary Freshwater Dispute ...

Latin America; in English (pdf) - Transboundary Freshwater Dispute ...

Latin America; in English (pdf) - Transboundary Freshwater Dispute ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX 4. TENDERS<br />

FOR LARGE PROJECTS<br />

AMAZON<br />

Umbrella of Hydro Projects/P080093<br />

The umbrella project <strong>in</strong>cludes the development of three run-of-river hydroelectric plants of sub-projects,<br />

Abanico, Sibimbe, and Sabanilla. Source: World Bank (WB) Group 2005.<br />

Country: Ecuador<br />

Sector: Energy & M<strong>in</strong><strong>in</strong>g (Renewable Energy)<br />

Cost <strong>in</strong> millions (USD): 1.81 Status: Approved Feb 4, 2005<br />

Sponsors: Hidrelgen<br />

Source: http://web.worldbank.org/external/projects/<br />

ma<strong>in</strong>?pagePK=104231&piPK=73230&theSitePK=40941&menuPK=228424&Projectid=P080093<br />

CHANGUINOLA<br />

Bonyic Hydroelectric Project/PN-0155<br />

This project <strong>in</strong>volves the design, development, construction, operation and ma<strong>in</strong>tenance of a 30 MW<br />

hydroelectric power plant and a small regulat<strong>in</strong>g day reservoir. Transmission facilities, <strong>in</strong>clud<strong>in</strong>g an 11 km,<br />

115 KV transmission l<strong>in</strong>e and associated substation will also be constructed. The project is located on the<br />

Quebrada Bonyic <strong>in</strong> northwestern Panama <strong>in</strong> the prov<strong>in</strong>ce of Bocas del Toro. The power will be transmitted<br />

to the city of Changu<strong>in</strong>ola, <strong>in</strong>stitut<strong>in</strong>g a predicted positive developmental impact on the impoverished region<br />

by provid<strong>in</strong>g a reliable source of reasonably priced electricity for the region. Source: Inter-<strong>America</strong>n Development<br />

Bank (IADB) 2005b.<br />

Country: Panama<br />

Sector: Private<br />

Cost <strong>in</strong> millions (USD): 50.0<br />

Status: Due Diligence<br />

Sponsors: Empresas Publicas de Medell<strong>in</strong>, Adm<strong>in</strong>istradora Serviagro, Consultores Asociados de Ingenieria,<br />

S.A., MacEnergy Limited<br />

Source: http://www.iadb.org/exr/doc98/pro/apn0155.<strong>pdf</strong><br />

CHIRA<br />

Poechos Hydropower Project<br />

This project will support a small 15.4 MW hydropower project. The ma<strong>in</strong> civil works built will be the <strong>in</strong>take<br />

and forced pipes, the mach<strong>in</strong>e house, the discharge canal, 100 m of access roads, and 38 km of transmission<br />

l<strong>in</strong>es. The project will generate ~60 GWh per year, to be sold for distribution <strong>in</strong> northwest Peru. Source:<br />

World Bank (WB) Group 2005.<br />

Country: Peru<br />

Sector: Energy & M<strong>in</strong><strong>in</strong>g (Renewable Energy, Power)<br />

Cost <strong>in</strong> millions (USD): 16.7 Status: Approved Dec 3, 2004<br />

Sponsors: S<strong>in</strong>ersa<br />

Source: http://web.worldbank.org/external/projects/<br />

ma<strong>in</strong>?pagePK=104231&piPK=73230&theSitePK=40941&menuPK=228424&Projectid=P081954<br />

128 — Hydropolitical Vulnerability and Resilience along International Waters: <strong>Lat<strong>in</strong></strong> <strong>America</strong> and the Caribbean

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!