Latin America; in English (pdf) - Transboundary Freshwater Dispute ...
Latin America; in English (pdf) - Transboundary Freshwater Dispute ...
Latin America; in English (pdf) - Transboundary Freshwater Dispute ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
APPENDIX 4. TENDERS<br />
FOR LARGE PROJECTS<br />
AMAZON<br />
Umbrella of Hydro Projects/P080093<br />
The umbrella project <strong>in</strong>cludes the development of three run-of-river hydroelectric plants of sub-projects,<br />
Abanico, Sibimbe, and Sabanilla. Source: World Bank (WB) Group 2005.<br />
Country: Ecuador<br />
Sector: Energy & M<strong>in</strong><strong>in</strong>g (Renewable Energy)<br />
Cost <strong>in</strong> millions (USD): 1.81 Status: Approved Feb 4, 2005<br />
Sponsors: Hidrelgen<br />
Source: http://web.worldbank.org/external/projects/<br />
ma<strong>in</strong>?pagePK=104231&piPK=73230&theSitePK=40941&menuPK=228424&Projectid=P080093<br />
CHANGUINOLA<br />
Bonyic Hydroelectric Project/PN-0155<br />
This project <strong>in</strong>volves the design, development, construction, operation and ma<strong>in</strong>tenance of a 30 MW<br />
hydroelectric power plant and a small regulat<strong>in</strong>g day reservoir. Transmission facilities, <strong>in</strong>clud<strong>in</strong>g an 11 km,<br />
115 KV transmission l<strong>in</strong>e and associated substation will also be constructed. The project is located on the<br />
Quebrada Bonyic <strong>in</strong> northwestern Panama <strong>in</strong> the prov<strong>in</strong>ce of Bocas del Toro. The power will be transmitted<br />
to the city of Changu<strong>in</strong>ola, <strong>in</strong>stitut<strong>in</strong>g a predicted positive developmental impact on the impoverished region<br />
by provid<strong>in</strong>g a reliable source of reasonably priced electricity for the region. Source: Inter-<strong>America</strong>n Development<br />
Bank (IADB) 2005b.<br />
Country: Panama<br />
Sector: Private<br />
Cost <strong>in</strong> millions (USD): 50.0<br />
Status: Due Diligence<br />
Sponsors: Empresas Publicas de Medell<strong>in</strong>, Adm<strong>in</strong>istradora Serviagro, Consultores Asociados de Ingenieria,<br />
S.A., MacEnergy Limited<br />
Source: http://www.iadb.org/exr/doc98/pro/apn0155.<strong>pdf</strong><br />
CHIRA<br />
Poechos Hydropower Project<br />
This project will support a small 15.4 MW hydropower project. The ma<strong>in</strong> civil works built will be the <strong>in</strong>take<br />
and forced pipes, the mach<strong>in</strong>e house, the discharge canal, 100 m of access roads, and 38 km of transmission<br />
l<strong>in</strong>es. The project will generate ~60 GWh per year, to be sold for distribution <strong>in</strong> northwest Peru. Source:<br />
World Bank (WB) Group 2005.<br />
Country: Peru<br />
Sector: Energy & M<strong>in</strong><strong>in</strong>g (Renewable Energy, Power)<br />
Cost <strong>in</strong> millions (USD): 16.7 Status: Approved Dec 3, 2004<br />
Sponsors: S<strong>in</strong>ersa<br />
Source: http://web.worldbank.org/external/projects/<br />
ma<strong>in</strong>?pagePK=104231&piPK=73230&theSitePK=40941&menuPK=228424&Projectid=P081954<br />
128 — Hydropolitical Vulnerability and Resilience along International Waters: <strong>Lat<strong>in</strong></strong> <strong>America</strong> and the Caribbean