20.10.2014 Views

Latin America; in English (pdf) - Transboundary Freshwater Dispute ...

Latin America; in English (pdf) - Transboundary Freshwater Dispute ...

Latin America; in English (pdf) - Transboundary Freshwater Dispute ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LEMPA<br />

La Esperanza Hydro Project/P088256<br />

The development objective of this project is to support a small 12 MW on the river Intibuca that would<br />

guarantee a reliable and steady supply of electricity to the town of La Esperanza and many of the surround<strong>in</strong>g<br />

communities.<br />

Country: Honduras<br />

Sector: Energy & M<strong>in</strong><strong>in</strong>g (Renewable Energy, Power)<br />

Cost <strong>in</strong> millions (USD): 1.4 Status: Approved Feb 1, 2005, Completion 2005<br />

Sponsors: Consorcio de Inversiones S.A. (CISA)<br />

Source: http://web.worldbank.org/external/projects/<br />

ma<strong>in</strong>?pagePK=104231&piPK=73230&theSitePK=40941&menuPK=228424&Projectid=P088256<br />

ORINOCO<br />

Tocoma Hydroelectric Project/VE<br />

roject/VE-L1003<br />

Last of 4 dams to be built on the Caroni River. The previous three provide nearly 72% of the energy used <strong>in</strong><br />

Venezuela and the completement of the Lower Caroni Hydroelectric Complex is hoped to enhance<br />

Venezuela’s supply of energy that is derived from renewable sources.<br />

Country: Venezuela<br />

Sector: Energy<br />

Cost <strong>in</strong> millions (USD): 750<br />

Status: F<strong>in</strong>al Stages of Feasibility Study & Site Preparation<br />

Sponsors: Venezuelan Corporation for Guyana (CVG-EDELCA)<br />

Source: http://www.iadb.org/exr/doc98/pro/pvel1003-06eng.<strong>pdf</strong><br />

Caruachi Hydroelectric Power Plant Project/788/OC<br />

roject/788/OC-VE<br />

The purpose of this project is to harness the water resources of the lower Caroni River to help meet the<br />

grow<strong>in</strong>g demand for electric power with<strong>in</strong> the country. The project will call for a hydroelectric power plant<br />

with a capacity for 2,160 MW and a concrete 360 meter gravity dam, a 900 meter right-abutment rockfill<br />

closure dam, and a 4,200 meter left-abutment earth and rockfill closure dam.<br />

Country: Venezuela<br />

Sector: Energy<br />

Cost <strong>in</strong> millions (USD): 2,130.4 Status: Approved 1993<br />

Source: http://www.iadb.org/exr/doc98/apr/ve788e.htm<br />

VALDIVIA<br />

Ralco Dam<br />

Installed capacity of the scheme is 570 MW, and <strong>in</strong>cludes a 150m high roller compacted concrete dam,<br />

which forms a reservoir that covers an area of 3395 hectares with total volume of 1,222 million cubic.<br />

Country: Chile<br />

Sector: Hydropower<br />

Cost <strong>in</strong> millions (USD):<br />

Status: Completion 2002<br />

Sponsors: International F<strong>in</strong>ance Corporation (IFC) 2005.<br />

Source: http://enr.construction.com/features/environment/archives/020819.asp<br />

La Higuera/21315<br />

270 MW hydroelectric power project on the T<strong>in</strong>guiririca River.<br />

Country: Chile<br />

Sector: Hydropower<br />

Cost <strong>in</strong> millions (USD): 260.0 Status: EIS Approved 2004, Completion 2010<br />

Sponsors: Pacific Hydro Ltd, Statkraft Norfund Power Invest AS (SNPI)<br />

Source: http://ifcln1.ifc.org/IFCExt/spiwebsite1.nsf/0/<br />

60f859e0234948ad85256f7100773628?OpenDocument<br />

Chacabuquito Hydro Power Project/P074619<br />

The Chacabuquito Hydro Power Project will consist of a run-of-the-river power plant with a capacity of 25<br />

MW. The project will utilize the waters of the Aconcagua river and will supply energy to the 5th region of<br />

Chile, near Los Andes, about 100 km Northeast of Santiago.<br />

Country: Chile<br />

Sector: Energy & M<strong>in</strong><strong>in</strong>g (Power)<br />

Cost <strong>in</strong> millions (USD): 260.03.5<br />

Status: Proposed<br />

Sponsors: Hidroelectrica Guardia Vieja SA<br />

Source: http://web.worldbank.org/external/projects/<br />

ma<strong>in</strong>?pagePK=104231&piPK=73230&theSitePK=40941&menuPK=228424&Projectid=P074619<br />

130 — Hydropolitical Vulnerability and Resilience along International Waters: <strong>Lat<strong>in</strong></strong> <strong>America</strong> and the Caribbean

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!