20.10.2014 Views

Latin America; in English (pdf) - Transboundary Freshwater Dispute ...

Latin America; in English (pdf) - Transboundary Freshwater Dispute ...

Latin America; in English (pdf) - Transboundary Freshwater Dispute ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LA PLATA<br />

Power Plant Dona Francisca/BR0315<br />

A 125-MW hydroelectric project on the Jacui River <strong>in</strong> the state of Rio Grande do Sul, Brazil.<br />

Country: Brazil<br />

Sector: Hydropower<br />

Cost <strong>in</strong> millions (USD): 118.0 Status: Approved 2000<br />

Sponsors: Inepar Energia, S.A., Centrais Eletricas de Santa Catar<strong>in</strong>a, Companhia Paranaen se de Energia,<br />

Gerdau, S.A., Desenvix, S.A.<br />

Source: http://www.iadb.org/pri/english/dbase/projectSummary.cfm?ProjectNumber=BR0315<br />

Campos Novos Hydroelectric Power Project/BR0370<br />

The Campos Novos Hydro power plant is located on the Canoas River, <strong>in</strong> the State of Santa Catar<strong>in</strong>a. The<br />

project consists of the development of an 880-MW HPP. The plant is comprised of three different parts: (i)<br />

three 293-MW turb<strong>in</strong>es, (ii) a 196-meter rock filled dam, (iii) an 11 km transmission l<strong>in</strong>e that will be connected<br />

to the Campos Novos substation. The site location will allow the Project to generate significant<br />

amounts of electricity from a comparatively small reservoir area.<br />

Country: Brazil<br />

Sector: Energy<br />

Cost <strong>in</strong> millions (USD): 523.9 Status: Approved 2004, Completion 2006<br />

Sponsors: CPFL Geraçno S.A., Companhia Brasileira de Alumínio S.A., Companhia Níquel Tocant<strong>in</strong>s S.A.,<br />

Companhia Estadual de Energia Elétrica S.A., Centrais Elétricas de Santa Catar<strong>in</strong>a S.A.<br />

Source: http://www.iadb.org/exr/doc98/pro/abr0370.<strong>pdf</strong><br />

Yacyreta Hydroelectric Project/P006036<br />

This project will consist of a 65 Km earth dam <strong>in</strong> the ma<strong>in</strong> channel of the Parana River, about 80 km from the<br />

cities of Posada, Argent<strong>in</strong>a & Encamacion, Paraguay. 20 Kaplan turb<strong>in</strong>es of 155 MW each will be built for a<br />

total capacity of 3100 MW. Will create a reservoir of 1065 Sq. Km with the potential to flood 107,000<br />

hectares and affect over 13,000 families.<br />

Country: Argent<strong>in</strong>a<br />

Sector: Energy & M<strong>in</strong><strong>in</strong>g (Power)<br />

Cost <strong>in</strong> millions (USD): 1300.0 Status: Approved Sep 29, 1992. Clos<strong>in</strong>g Date Dec 31, 2000<br />

Sponsors: EBY<br />

Source: http://web.worldbank.org/external/projects/<br />

ma<strong>in</strong>?pagePK=104231&piPK=73230&theSitePK=40941&menuPK=228424&Projectid=P006036<br />

Barra Grande Hydroelectric Power Plant<br />

The hydroelectric power plant of Barra Grande is under construction <strong>in</strong> the River Pelotas, between the<br />

counties of Anita Garibaldi, SC, and P<strong>in</strong>hal da Serra, RS. Its reservoir will have a volume of 5 km³, an<br />

<strong>in</strong>stalled power of 708 MW and the power ensured for CBA will be of 500 thousand MWh/year.<br />

Country: Brazil<br />

Sector: Power<br />

Cost <strong>in</strong> millions (USD): Baesa (Energética Barra Grande S.A.) (merge of five companies: Alcoa Alumínio<br />

[42.2%], Companhia Paulista de Força e Luz (CPFL) [25%], Companhia Brasileira de Alumínio (CBA) [15%],<br />

Camargo Corrêa Cimentos [9%], and DME Energética [ 8.8%] received <strong>in</strong>vestments of about R$ 1.5 billion<br />

and will <strong>in</strong>vest another R$ 200 million by means of compensation measures, aim<strong>in</strong>g to mitigate social and<br />

environmental impacts caused by the enterprise. Status: Completion 2005<br />

Sponsors: CBA<br />

Source: http://www.alum<strong>in</strong>iocba.com.br/en/us<strong>in</strong>a_barra_grande.php<br />

Our<strong>in</strong>hos Hydroelectric Power Plant<br />

The hydroelectric power plant of Our<strong>in</strong>hos will be built by CBA along the waters of the River Paranapanema,<br />

between the cities of Our<strong>in</strong>hos, SP, and Jacarez<strong>in</strong>ho, PR. The <strong>in</strong>stalled potential will be of 44 MW, and the<br />

power generated about 207 thousand MWh/year. The concession period is of 35 years, which started <strong>in</strong> July<br />

2000.<br />

Country: Brazil<br />

Sector: Power<br />

Cost <strong>in</strong> millions (USD): 62.3 Status: Exacation, Completion 2005<br />

Sponsors: CBA<br />

Source: http://www.alum<strong>in</strong>iocba.com.br/en/us<strong>in</strong>a_our<strong>in</strong>hos.php<br />

Appendix 4. Tenders for Large Projects — 129

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!