LA PLATA<br />
Power Plant Dona Francisca/BR0315<br />
A 125-MW hydroelectric project on the Jacui River <strong>in</strong> the state of Rio Grande do Sul, Brazil.<br />
Country: Brazil<br />
Sector: Hydropower<br />
Cost <strong>in</strong> millions (USD): 118.0 Status: Approved 2000<br />
Sponsors: Inepar Energia, S.A., Centrais Eletricas de Santa Catar<strong>in</strong>a, Companhia Paranaen se de Energia,<br />
Gerdau, S.A., Desenvix, S.A.<br />
Source: http://www.iadb.org/pri/english/dbase/projectSummary.cfm?ProjectNumber=BR0315<br />
Campos Novos Hydroelectric Power Project/BR0370<br />
The Campos Novos Hydro power plant is located on the Canoas River, <strong>in</strong> the State of Santa Catar<strong>in</strong>a. The<br />
project consists of the development of an 880-MW HPP. The plant is comprised of three different parts: (i)<br />
three 293-MW turb<strong>in</strong>es, (ii) a 196-meter rock filled dam, (iii) an 11 km transmission l<strong>in</strong>e that will be connected<br />
to the Campos Novos substation. The site location will allow the Project to generate significant<br />
amounts of electricity from a comparatively small reservoir area.<br />
Country: Brazil<br />
Sector: Energy<br />
Cost <strong>in</strong> millions (USD): 523.9 Status: Approved 2004, Completion 2006<br />
Sponsors: CPFL Geraçno S.A., Companhia Brasileira de Alumínio S.A., Companhia Níquel Tocant<strong>in</strong>s S.A.,<br />
Companhia Estadual de Energia Elétrica S.A., Centrais Elétricas de Santa Catar<strong>in</strong>a S.A.<br />
Source: http://www.iadb.org/exr/doc98/pro/abr0370.<strong>pdf</strong><br />
Yacyreta Hydroelectric Project/P006036<br />
This project will consist of a 65 Km earth dam <strong>in</strong> the ma<strong>in</strong> channel of the Parana River, about 80 km from the<br />
cities of Posada, Argent<strong>in</strong>a & Encamacion, Paraguay. 20 Kaplan turb<strong>in</strong>es of 155 MW each will be built for a<br />
total capacity of 3100 MW. Will create a reservoir of 1065 Sq. Km with the potential to flood 107,000<br />
hectares and affect over 13,000 families.<br />
Country: Argent<strong>in</strong>a<br />
Sector: Energy & M<strong>in</strong><strong>in</strong>g (Power)<br />
Cost <strong>in</strong> millions (USD): 1300.0 Status: Approved Sep 29, 1992. Clos<strong>in</strong>g Date Dec 31, 2000<br />
Sponsors: EBY<br />
Source: http://web.worldbank.org/external/projects/<br />
ma<strong>in</strong>?pagePK=104231&piPK=73230&theSitePK=40941&menuPK=228424&Projectid=P006036<br />
Barra Grande Hydroelectric Power Plant<br />
The hydroelectric power plant of Barra Grande is under construction <strong>in</strong> the River Pelotas, between the<br />
counties of Anita Garibaldi, SC, and P<strong>in</strong>hal da Serra, RS. Its reservoir will have a volume of 5 km³, an<br />
<strong>in</strong>stalled power of 708 MW and the power ensured for CBA will be of 500 thousand MWh/year.<br />
Country: Brazil<br />
Sector: Power<br />
Cost <strong>in</strong> millions (USD): Baesa (Energética Barra Grande S.A.) (merge of five companies: Alcoa Alumínio<br />
[42.2%], Companhia Paulista de Força e Luz (CPFL) [25%], Companhia Brasileira de Alumínio (CBA) [15%],<br />
Camargo Corrêa Cimentos [9%], and DME Energética [ 8.8%] received <strong>in</strong>vestments of about R$ 1.5 billion<br />
and will <strong>in</strong>vest another R$ 200 million by means of compensation measures, aim<strong>in</strong>g to mitigate social and<br />
environmental impacts caused by the enterprise. Status: Completion 2005<br />
Sponsors: CBA<br />
Source: http://www.alum<strong>in</strong>iocba.com.br/en/us<strong>in</strong>a_barra_grande.php<br />
Our<strong>in</strong>hos Hydroelectric Power Plant<br />
The hydroelectric power plant of Our<strong>in</strong>hos will be built by CBA along the waters of the River Paranapanema,<br />
between the cities of Our<strong>in</strong>hos, SP, and Jacarez<strong>in</strong>ho, PR. The <strong>in</strong>stalled potential will be of 44 MW, and the<br />
power generated about 207 thousand MWh/year. The concession period is of 35 years, which started <strong>in</strong> July<br />
2000.<br />
Country: Brazil<br />
Sector: Power<br />
Cost <strong>in</strong> millions (USD): 62.3 Status: Exacation, Completion 2005<br />
Sponsors: CBA<br />
Source: http://www.alum<strong>in</strong>iocba.com.br/en/us<strong>in</strong>a_our<strong>in</strong>hos.php<br />
Appendix 4. Tenders for Large Projects — 129