04.11.2012 Views

0 Contents - Hilti Svenska AB

0 Contents - Hilti Svenska AB

0 Contents - Hilti Svenska AB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

X-HS, X-CC<br />

X-CC order information<br />

Current portfolio Future portfolio<br />

Item no. Designation Item no. Designation<br />

313177 X-CC DNI 27 P8 386229 X-CC U22 P8<br />

299929 X-CC DNI 32 P8 386230 X-CC U27 P8<br />

299935 X-CC AL 27 P8<br />

299936 X-CC EDNI 16 P8 386228 X-CC U16 P8<br />

For X-U program availability please contact <strong>Hilti</strong> in your country.<br />

Cartridge selection<br />

Cartridge recommendation:<br />

Steel: 6.8/11M red cartridge<br />

Concrete: 6.8/11M yellow cartridge on green/fresh and standard concrete<br />

6.8/11M red cartridge on precast, old and hard concrete<br />

Tool energy adjustment by setting tests on site.<br />

Fastening quality assurance<br />

Installation<br />

X-HS<br />

1.<br />

Attach the threaded<br />

rod to the X-HS<br />

before fastening<br />

X-CC<br />

1.<br />

Assemble the<br />

wire with the<br />

X-CC<br />

23<br />

o 5<br />

2.<br />

For DKH 48<br />

pre-drill (∅ 5 x 23)<br />

23<br />

o 5<br />

2.<br />

For DKH 48 or<br />

DNH 37 pre-drill<br />

(∅ 5 x 23 or ∅ 5 x<br />

18)<br />

3.<br />

Load the assembly<br />

into the tool<br />

3.<br />

Load the assembly<br />

into the tool<br />

4.<br />

Locate the nail,<br />

compress the tool,<br />

pull the trigger and<br />

the fastening is<br />

complete<br />

4.<br />

Locate the nail,<br />

compress the tool,<br />

pull the trigger and<br />

the fastening is<br />

complete<br />

5.<br />

Bend the X-HS<br />

assembly down to<br />

the vertical position<br />

5.<br />

Adjust the wire<br />

as required<br />

4.182 11 / 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!