24.12.2014 Views

Installation Notes - USP Connectors

Installation Notes - USP Connectors

Installation Notes - USP Connectors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Adjustable Rafter-To-Plate <strong>Connectors</strong> – TMP & TMPH series<br />

The TMP and TMPH are designed to make rafter-to-plate<br />

connections and eliminates time-consuming bird’s-mouth<br />

notching or bevel plate installation. Both series are available<br />

in I-Joists sizes, as well as standard 2x sizes.<br />

TMP – Adjusts to pitches from 1/12 to 6/12.<br />

TMPH – Adjusts to pitches from 6/12 to 14/12.<br />

EWP Hangers<br />

© Copyright 2013 <strong>USP</strong> Structural <strong>Connectors</strong> ®<br />

Materials: TMP – 18 gauge<br />

TMPH – 16 gauge;<br />

Fulcrum – 12 gauge<br />

Finish: G90 galvanizing<br />

Codes: Load values are derived from<br />

data submitted to various<br />

North American building<br />

code evaluators.<br />

Pitch Range:<br />

TMP – 1 /12 - 6 /12<br />

TMPH – 6 /12 - 14 /12<br />

<strong>Installation</strong>:<br />

• Use all specified fasteners. See Product <strong>Notes</strong>, page 10.<br />

• Position connector on top plate. Fasten connector to<br />

outside of top plate with specified nails. Insert rafter into<br />

rafter pocket. Adjust rafter and pocket to correct pitch.<br />

Fasten rafter to connector with specified nails. Installing<br />

the TMP requires driving specified nails through the<br />

opposing slots in the pocket. TMPH installation involves<br />

sliding the fulcrum until it supports the pocket at the<br />

desired pitch and nailing down through the fulcrum base<br />

into the top plate to lock the fulcrum into position.<br />

H<br />

Typical TMPH<br />

installation<br />

L<br />

W<br />

D<br />

TMPH<br />

fulcrum<br />

4 11 /16˝<br />

Typical TMP<br />

installation<br />

3 1 /2˝<br />

W<br />

L<br />

TMP<br />

Dimensions (in) Fastener Schedule 2,3<br />

Factored Resistance<br />

Plate Rafter DF-L (Lbs) DF-L (kN) S-P-F (Lbs) S-P-F (kN)<br />

<strong>USP</strong><br />

Steel<br />

Vertical Uplift 1 Vertical Uplift 1 Vertical Uplift 1 Vertical Uplift 1<br />

Rafter Width Stock No. Ref. No. Gauge W L Qty Type Qty Type 100% 115% 100% 115% 100% 115% 100% 115%<br />

1-1/2 TMP2 VPA2 18 1-9/16 5-9/16 6 10d 4 10d x 1-1/2 1425 230 6.34 1.02 1225 195 5.45 0.87<br />

1-3/4 TMP175 VPA25 18 1-13/16 5-9/16 6 10d 4 10d x 1-1/2 1655 230 7.36 1.02 1425 195 6.34 0.87<br />

2 or 2-1/8 TMP21<br />

VPA2.06,<br />

VPA2.1<br />

18 2-1/8 6-3/8 6 10d 4 10d x 1-1/2 1860 230 8.27 1.02 1600 195 7.12 0.87<br />

2-5/16 TMP23 VPA35 18 2-3/8 6-3/8 6 10d 4 10d x 1-1/2 2835 230 12.61 1.02 2440 195 10.85 0.87<br />

2-1/2 or 2-5/8 TMP25 VPA3 18 2-11/16 6-3/8 6 10d 4 10d x 1-1/2 2835 230 12.61 1.02 2440 195 10.85 0.87<br />

3 TMP31 -- -- 18 3-1/8 7-5/16 6 10d 4 10d x 1-1/2 2835 230 12.61 1.02 2440 195 10.85 0.87<br />

3-1/2 TMP4 VPA4 18 3-9/16 7-5/16 6 10d 4 10d x 1-1/2 2835 230 12.61 1.02 2440 195 10.85 0.87<br />

1) Factored resistances have been increased 15% for short-term loads such as wind and earthquake; no further increase is allowed.<br />

2) Minimum nail embedment shall be 8 nail diameters (typ).<br />

3) NAILS<br />

Dimensions (in)<br />

Fastener Schedule 3,4<br />

Plate Rafter 2<br />

<strong>USP</strong><br />

According to Pitch Uplift 1 According to Pitch Uplift 1<br />

Rafter Width Stock No. Ref. No. W H D L Qty Type Qty Type Unit 6/12 7/12 8/12 10/12 12/12 115% 6/12 7/12 8/12 10/12 12/12 115%<br />

1-1/2<br />

1-3/4<br />

TMPH2<br />

TMPH175<br />

VPA2<br />

VPA25<br />

1-9/16<br />

1-13/16<br />

2-1/2<br />

2-3/8<br />

4<br />

4<br />

6-9/16<br />

6-9/16<br />

10<br />

10<br />

10d<br />

10d<br />

8<br />

8<br />

10d x 1-1/2<br />

10d x 1-1/2<br />

Lbs 4595 4565 4480 4090 3485 250 3950 3925 3855 3515 2995 215<br />

kN 20.44 20.31 19.93 18.19 15.50 1.11 17.57 17.46 17.15 15.64 13.32 0.96<br />

Lbs 4595 4565 4480 4090 3485 250 3950 3925 3855 3515 2995 215<br />

kN 20.44 20.31 19.93 18.19 15.50 1.11 17.57 17.46 17.15 15.64 13.32 0.96<br />

2<br />

<br />

Lbs 4595 4565 4480 4090 3485 250 3950 3925 3855 3515 2995 215<br />

TMPH21<br />

2-1/8 2-5/8 4 7-3/8 10 10d 8 10d x 1-1/2<br />

or 2-1/8<br />

VPA2.1<br />

kN 20.44 20.31 19.93 18.19 15.50 1.11 17.57 17.46 17.15 15.64 13.32 0.96<br />

2-5/16 TMPH23 VPA35 2-3/8 2-1/2 4 7-3/8 10 10d 8 10d x 1-1/2<br />

Lbs 4595 4565 4480 4090 3485 250 3950 3925 3855 3515 2995 215<br />

kN 20.44 20.31 19.93 18.19 15.50 1.11 17.57 17.46 17.15 15.64 13.32 0.96<br />

2-1/2<br />

Lbs 4595 4565 4480 4090 3485 250 3950 3925 3855 3515 2995 215<br />

TMPH25 VPA3 2-11/16 2-5/16 4 7-3/8 10 10d 8 10d x 1-1/2<br />

or 2-5/8<br />

kN 20.44 20.31 19.93 18.19 15.50 1.11 17.57 17.46 17.15 15.64 13.32 0.96<br />

3<br />

3-1/2<br />

TMPH31<br />

TMPH4<br />

-- --<br />

VPA4<br />

3-1/8<br />

3-9/16<br />

2-11/16<br />

2-1/2<br />

4<br />

4<br />

8-9/16<br />

8-9/16<br />

10<br />

10<br />

10d<br />

10d<br />

8<br />

8<br />

10d x 1-1/2<br />

10d x 1-1/2<br />

Lbs 4595 4565 4480 4090 3485 250 3950 3925 3855 3515 2995 215<br />

kN 20.44 20.31 19.93 18.19 15.50 1.11 17.57 17.46 17.15 15.64 13.32 0.96<br />

Lbs 4595 4565 4480 4090 3485 250 3950 3925 3855 3515 2995 215<br />

kN 20.44 20.31 19.93 18.19 15.50 1.11 17.57 17.46 17.15 15.64 13.32 0.96<br />

1) Factored resistances have been increased 15% for short-term loads such as wind and earthquake; no further increase is allowed.<br />

2) Web stiffeners are required for all Wood I-Joist installations.<br />

3) Minimum nail embedment shall be 8 nail diameters (typ).<br />

4) NAILS<br />

DF-L<br />

Factored Resistance<br />

1-800-328-5934 • www.<strong>USP</strong>connectors.com 143<br />

<strong>USP</strong>2240-131<br />

S-P-F

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!