24.12.2014 Views

Installation Notes - USP Connectors

Installation Notes - USP Connectors

Installation Notes - USP Connectors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Moisture Barrier Plates – NOP series<br />

Moisture Barrier Plates protect the bottom chords<br />

of trusses from moisture damage caused by direct<br />

contact with concrete. These plates eliminate the<br />

need for more expensive treated wood plates.<br />

W<br />

L<br />

Truss & Rafter<br />

Materials: See chart<br />

Finish: G90 galvanizing<br />

<strong>Installation</strong>:<br />

• Use all specified fasteners. See Product <strong>Notes</strong>,<br />

page 10.<br />

• Pre-attach to truss bottom chord or rafter using<br />

prepunched prongs and/or 6d common nails to<br />

prevent wood-to-concrete contact.<br />

<strong>USP</strong><br />

Steel<br />

Dimensions Fastener Schedule 1,2<br />

Size Stock No. Ref. No. Gauge W L Qty Type<br />

NOP2X TSS2, TBP8 26 1-7/16 8 -- -- -- --<br />

2x<br />

NOP1 -- -- 22 1-1/2 8 2 6d<br />

4x NOP4 TSS2-2 26 3-1/2 8 2 6d<br />

1) Minimum nail embedment shall be 8 nail diameters (typ).<br />

2) NAILS<br />

W<br />

NOP1<br />

L<br />

NOP2X<br />

NOP4<br />

W<br />

Typical NOP4<br />

installation<br />

NOP4<br />

L<br />

© Copyright 2013 <strong>USP</strong> Structural <strong>Connectors</strong> ®<br />

Embedded Truss Anchors – LPTA<br />

Low profile design attaches to 2 x 4 or larger bottom chords and<br />

provides uplift and lateral load resistance.<br />

Materials: 18 gauge<br />

Finish: G90 galvanizing<br />

Codes: Load values are derived from data<br />

submitted to various North American<br />

building code evaluators.<br />

F 1<br />

Uplift<br />

F 2<br />

<strong>Installation</strong>:<br />

• Use all specified fasteners. See Product <strong>Notes</strong>, page 10.<br />

• Embed LPTA 4˝ into concrete tie beam or masonry bond<br />

beam.<br />

• Anchors should be spaced no closer than 8˝ centre-to-centre.<br />

• Moisture barrier may be required.<br />

Typical LPTA installation<br />

W<br />

Dimensions (in)<br />

Fastener Schedule<br />

Factored Resistance (115%) 1<br />

<strong>USP</strong><br />

Steel<br />

Min<br />

DF-L (Lbs) DF-L (kN) S-P-F (Lbs) S-P-F (kN)<br />

Stock No. Ref. No. Gauge W H Qty 2 Type 3,4 Uplift F1 F2 Uplift F1 F2 Uplift F1 F2 Uplift F1 F2<br />

LPTA LTA2 18 5 8-1/4 10 10d x 1-1/2 1555 1005 1865 6.92 4.47 8.30 1555 1005 1865 6.92 4.47 8.30<br />

1) Factored resistances have been increased 15% for short-term loads such as wind and earthquake; reduce for other<br />

load durations in accordance with the code.<br />

2) Minimum quantity of fasteners to be installed. Product may have additional nail holes not needed to meet<br />

published factored resistance of product.<br />

3) Minimum nail embedment shall be 8 nail diameters (typ).<br />

4) NAILS<br />

1 7 /16˝<br />

LPTA<br />

H<br />

1 3 /4˝<br />

152<br />

1-800-328-5934 • www.<strong>USP</strong>connectors.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!