ATTACHMENT E - REVISED NOISE AND DUST MANAGMENT PLAN<br />

ITEM 11.1 COUNCIL 24/04/2013<br />

Sand Extraction – Lot 75, Haag Road, Yelverton<br />

7.2 NOISE MONITORING PROGRAM<br />

The Project will conduct routine monitoring <strong>of</strong> noise emissions on an ongoing basis and when feedback<br />

indicates that noise levels may be increasing or problematic. Major activities such as rehabilitation<br />

events, such as topsoil and overburden stockpiling and return will be monitored more closely as these<br />

short term events are recognised as having high noise potential.<br />

Noise monitoring will conducted at least quarterly at suitable locations that will be determined prior to<br />

commencement <strong>of</strong> Project establishment.<br />

Operational checks will be carried out by site personnel as required to confirm operational targets are<br />

being met.<br />

In the event <strong>of</strong> a perceived noise problem additional confirmatory monitoring may be conducted at the<br />

premises <strong>of</strong> neighbouring residences, subject to landowner permission.<br />

Table 7-4 Noise Monitoring Program<br />

Monitoring<br />

Activity<br />

Location(s) Parameters Frequency Assessment<br />

Criteria<br />

Attended<br />

Monitoring<br />

TBA L 10 , L 1 , L max (15min, A-<br />

weighting, Slow (AS)),<br />

Wind speed and<br />

direction, Audible noise<br />

At least quarterly<br />

Noise Regulations<br />

– industrial<br />

premises<br />

boundary, internal<br />

targets<br />

Operational<br />

Checks<br />

Various boundary<br />

locations<br />

Average instantaneous<br />

levels (L AS )<br />

As required<br />

Internal targets<br />

7.2.1 Targets and Trigger Levels<br />

Internal targets will apply to Noise Sensitive Premises (i.e. neighbouring residences with which an<br />

operating agreement has not been made). These internal targets have been set on a conservative basis<br />

and shown in Table 7-5.<br />

When Project establishment activities are occurring near a boundary monitoring point revised targets will<br />

be determined based on a case by case basis, taking into account relative distances between the<br />

activities, monitoring points and neighbouring residences.<br />

Table 7-5 Noise Management Assessment Criteria (dB)<br />

Location Time <strong>of</strong> Day L A10 L A1 L A Max<br />

Noise regulations assigned levels<br />

Industrial premises boundary<br />

All hours 65 80 90<br />

Internal Targets<br />

Premises boundary Daytime (7am-7pm, Mon-Sat) 45 55 65<br />