31.12.2014 Views

Attachments - City of Busselton

Attachments - City of Busselton

Attachments - City of Busselton

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

COASTAL AND FORESHORE FACILITIES ASSET MANAGEMENT AND EXPANSION PLAN<br />

COUNCIL 24/04/2013<br />

ITEM 12.1<br />

ATTACHMENT A<br />

Category 3 – Local Coastal Node<br />

Basic infrastructure provided to organize beach access. Mostly used by residents to<br />

have access to the local coastline. (eg. Deere St)<br />

Figure15 Deere St, Augusta, Local Coastal Node<br />

In preparing the Plan a higher relative weighting has been applied to the high rated category<br />

in scheduling the capital works program. Each asset group (carpark, timber platform, etc.)<br />

condition assessed, combined with the hierarchy category <strong>of</strong> the coastal node defined the<br />

priority for expenditure purposes in order to create a ranking to guide the coastal<br />

infrastructure investment the future.<br />

4 COASTAL PRECINCTS<br />

Due to the large extent <strong>of</strong> the coastline within the Augusta Margaret River Shire this Plan<br />

divided the areas with similar characteristics into six (6) Coastal Precincts. The Augusta<br />

Margaret River Shire manages three (3) <strong>of</strong> these precincts (Gracetown, Prevelly and<br />

Augusta) whilst the other three (3) are managed by the Department <strong>of</strong> Environment and<br />

Conservation (DEC), being (North <strong>of</strong> Gracetown, South <strong>of</strong> Gracetown to North <strong>of</strong> Prevelly<br />

and South <strong>of</strong> Prevelly to North <strong>of</strong> Augusta).<br />

In seeking external funding it is appropriate, where desired, to do so at a precinct level.<br />

The condition assessment results, replacement and upgrade recommendations for each<br />

precinct are presented below.<br />

Table 42 below presents a summary <strong>of</strong> the total annual expenditure for the Augusta<br />

Margaret River Shire for the next 10 years. All values presented below are in Year 1 Dollars.<br />

<strong>City</strong> <strong>of</strong> <strong>Busselton</strong> and Shire <strong>of</strong> Augusta Margaret River PAGE 97

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!