31.12.2014 Views

Attachments - City of Busselton

Attachments - City of Busselton

Attachments - City of Busselton

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

COUNCIL 24/04/2013<br />

ITEM 12.1<br />

ATTACHMENT A<br />

COASTAL AND FORESHORE FACILITIES ASSET MANAGEMENT AND EXPANSION PLAN<br />

• legislative requirements<br />

• standards and Codes <strong>of</strong> Practice<br />

Asset Management for s<strong>of</strong>t infrastructure (eg trees, lawns) is evolving presently and as such<br />

precise widely endorsed terminology and understanding for this is not in place. The approach<br />

taken here considered the replacement cost as the current value <strong>of</strong> the s<strong>of</strong>t assets. The<br />

assessment quantified and rated the condition <strong>of</strong> the landscape s<strong>of</strong>t assets present at the<br />

coastal nodes, but did not cover the native coastal bush areas.<br />

To increase the knowledge about the management <strong>of</strong> s<strong>of</strong>t assets the staff involved in this<br />

Plan attended the IPWEA Parks Seminar held in Perth in March 2012. The latest<br />

methodologies utilised in the s<strong>of</strong>t asset management were discussed and some <strong>of</strong> the<br />

information presented was utilised in this Plan.<br />

2.2 Research and Community Expectation<br />

The customer research into community infrastructure needs and satisfaction included:<br />

<br />

Newspaper advertising<br />

A newspaper advertisement was placed at the local newspaper inviting the<br />

community to comment on asset requirements for the <strong>City</strong>’s coastal infrastructure and<br />

facilities. It was located within the CoB page and also contained contact details and<br />

an invitation to the public meetings held in <strong>Busselton</strong> and Dunsborough.<br />

<br />

Community forums<br />

Two public meetings were held during the consultation period. The first one was held<br />

on the 11 th <strong>of</strong> April 2012 at Churchill Park Hall, Adelaide Street <strong>Busselton</strong>.<br />

The second meeting was held on the 12 th <strong>of</strong> April 2012 at the Naturaliste Community<br />

Centre, Dunsborough.<br />

A PowerPoint presentation was prepared and presented to the public using a<br />

projector. After the explanation <strong>of</strong> the project methodology and outcomes, the time<br />

was dedicated to an open discussion with the attendants. Some members <strong>of</strong> the<br />

public filled the comments templates provided and others collected contact details<br />

and sent their comments in the following weeks.<br />

<br />

Liaison with community groups<br />

A list including the community groups suggested for consultation purposes was<br />

provided by the CoB in March 2012. Letters were posted to the listed groups and<br />

feedback was provided via letters, e-mails and phone calls. Meetings were also held<br />

to discuss specific items when required.<br />

<br />

Input from community members<br />

During the preparation <strong>of</strong> the plan general public comments were received via e-<br />

mails, letters and interaction during the site visits.<br />

<strong>City</strong> <strong>of</strong> <strong>Busselton</strong> and Shire <strong>of</strong> Augusta Margaret River PAGE 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!