The new interchange with Main Street is configured as an urban half-cloverleaf-type<br />

interchange in which both the eastbound and westbound ramps are located east of<br />

Main Street.<br />

This proposed interchange configuration takes advantage of the topography, existing<br />

cultural resources, and existing roadway infrastructure including Monument Place<br />

and access to Mount Ararat High School. The ramps provide free-flow access to and<br />

from the Coastal Connector before transitioning to a three-lane roadway section,<br />

which includes two travel lanes and a center left-turn lane that allows controlled<br />

access to abutting properties before intersecting with Main Street. In Option 3, Main<br />

Street is widened and reconstructed for approximately 0.6 mile beginning at<br />

approximately 0.1 mile north of Pleasant Street and ending in the vicinity of Forrest<br />

Drive to the north. The widening includes one travel lane in each direction and a<br />

raised-median island that transitions to a left-turn lane (if required) at intersections.<br />

Sidewalks are constructed on both sides of Main Street and along the north side of<br />

the westbound ramps into the Mount Ararat High School <strong>com</strong>plex. The eastbound<br />

ramps intersect Main Street at a new signalized intersection opposite Monument<br />

Place. The westbound ramps intersect Main Street at a new signalized intersection at<br />

the existing entrance to Mount Ararat High School. The high school access shifts to<br />

the east and connects to the westbound ramps. A new connector roadway intersects<br />

opposite the high school, creating the fourth leg of the signalized intersection. The<br />

roadway extends from Main Street westerly and southerly for approximately 0.3<br />

mile, connecting opposite Mallet Drive at its current signalized intersection with<br />

Lewiston Road. In Figure 4-6, a future multiuse trail is shown adjacent to the Coastal<br />

Connector. The proposed interchange ramps provide continuity along the Coastal<br />

Connector corridor and connectivity to adjacent connecting roadways.<br />

Option 3 includes reconstruction of 0.6 mile of Main Street; 1.2 miles of Lewiston<br />

Road/Coastal Connector; 0.5 mile<br />

of ramps and connector roadway;<br />

two signals on Main Street; 1.3<br />

miles of sidewalk and 3.0 miles of<br />

bicycle–roadway shoulder; 0.4<br />

mile of retaining walls; one<br />

bridge over Main Street; two box<br />

culverts crossing unnamed<br />

brooks; and extension of the<br />

Coastal Connector bridge over<br />

the Lower Road Rail Line.<br />

Summary of Options 99