- Page 1 and 2: Transportation Feasibility Study Re
- Page 4 and 5: Table of Contents Executive Summary
- Page 6 and 7: 4.11.1 Maine Street/US Route 1 Inte
- Page 8 and 9: List of Figures Figure No. Descript
- Page 10 and 11: Executive Summary Introduction/Back
- Page 12 and 13: motorists to get out of their vehic
- Page 14 and 15: along each of the cross roadways. U
- Page 16 and 17: leg of the intersection, which prov
- Page 20 and 21: 1 Introduction 1.1 Project Backgrou
- Page 22 and 23: Throughout this Feasibility Study,
- Page 24 and 25: 1.4.1 Public Informational Meetings
- Page 26 and 27: Table 1.4-3. Study Advisory Committ
- Page 28 and 29: F CATHANCE RIVER MEADOW RD W HITEHO
- Page 30 and 31: as a principal arterial and extends
- Page 32 and 33: membership fee of $35. ZipCar membe
- Page 34 and 35: network, with the goal of providing
- Page 36 and 37: Androscoggin River Bicycle and Pede
- Page 38 and 39: 2009 Design Hour Volume The unit of
- Page 40 and 41: Table 2.2-1. Existing Traffic-Volum
- Page 42 and 43: USE CROOSING RD JESSE RD D AUGUST C
- Page 44: Table 2.2-3. Unsignalized Intersect
- Page 47 and 48: were identified, individual police
- Page 49 and 50: determined to be HCLs. A sixth inte
- Page 51 and 52: HOUSE CROOSING RD JESSE RD RD AUGUS
- Page 53 and 54: grocery store. The size of the pond
- Page 55 and 56: The Strategy 2B Study Area east of
- Page 57 and 58: Sections 435-449). However, the riv
- Page 59 and 60: Areas mapped by the NRCS as Prime F
- Page 61 and 62: OUSE CROOSING RD JESSE RD RD AUGUST
- Page 63 and 64: OUSE CROOSING RD JESSE RD RD AUGUST
- Page 65 and 66: OUSE CROOSING RD JESSE RD RD AUGUST
- Page 67 and 68: the MRRA. This report presents info
- Page 69 and 70:
anged between 14 sales in 2008 and
- Page 71 and 72:
to have covered the entire town. No
- Page 73 and 74:
Table 2.4-1. Properties Listed in t
- Page 75 and 76:
Town/Address /Location Name Brief D
- Page 77 and 78:
unclear whether any other additiona
- Page 79 and 80:
Strategy 2B Based on field observat
- Page 81 and 82:
P USE CROOSING RD JESSE RD D AUGUST
- Page 83 and 84:
3 Future Conditions 3.1 Introductio
- Page 85 and 86:
3.3 NASB and Topsham Annex Trip Est
- Page 89 and 90:
(also known as internal capture). A
- Page 91 and 92:
4 Summary of Options 4.1 Introducti
- Page 93 and 94:
Site Walk Access Improvements: This
- Page 95 and 96:
4.5 Passenger Rail and Bus Rapid Tr
- Page 97 and 98:
and then overpasses US Route 1 adja
- Page 99 and 100:
parallel to US Route 1. They termin
- Page 101 and 102:
MAP-41 LOT-14E MAP-41 LOT-14D MAP-4
- Page 103 and 104:
MAP-41 LOT-17B MAP-44 LOT-1 MAP-44
- Page 105 and 106:
o o Options 3A and 3B assess the po
- Page 107 and 108:
short distance (i.e., 0.1 mile) bef
- Page 109 and 110:
4.7.5 Option 3A Option 3A (Figure 4
- Page 111 and 112:
Option 5 widens and reconstructs a
- Page 113 and 114:
HORTON PL REST DR UV196 ANTHONYAV 2
- Page 115 and 116:
AV Map R05A Lot 30- Map R05A Lot 31
- Page 117 and 118:
Map R04 Lot 18- Map R04 Lot 47-2 LL
- Page 119 and 120:
4.8 Strategy 2B - Improve Mobility
- Page 121 and 122:
four options, and the maximum benef
- Page 123 and 124:
oundabout from the south. This opti
- Page 125 and 126:
MAP-U25 LOT-20 Bailey Ln Ln B ailey
- Page 127 and 128:
MAP-U24 LOT-2A River Rd MAP-U24 LOT
- Page 129 and 130:
MAP-U25 LOT-20 MAP-16 LOT-1 Bailey
- Page 131 and 132:
MAP-U25 LOT-20 MAP-16 LOT-1 Bailey
- Page 133 and 134:
Option 1 includes continuous sidewa
- Page 135 and 136:
MAP-U23 LOT-94 MAP-U23 LOT-90 Map U
- Page 137 and 138:
The primary challenge with Option 1
- Page 139 and 140:
Town of Brunswick, Maine MAP-U04 LO
- Page 141 and 142:
Town of Brunswick, Maine 1 £¤ And
- Page 143 and 144:
Results of the preliminary screenin
- Page 145 and 146:
Summary of Options 136
- Page 147 and 148:
5.1.2 Traffic Operations As previou
- Page 149 and 150:
5.1.4 Cost Estimates Planning-level
- Page 151 and 152:
impacted property. However, using t
- Page 153:
Bath Road. The following signalized
- Page 156 and 157:
5.2.3 Build Options A traffic-opera
- Page 158 and 159:
(USACE) if it is selected for advan
- Page 160 and 161:
oadways located on the northeast an
- Page 162 and 163:
intersection of US Route 201 and Ol
- Page 164 and 165:
etaining a signalized intersection
- Page 166 and 167:
5.2.3.4 Strategy 2C - Improve Mobil
- Page 168 and 169:
Environmental Impacts Environmental
- Page 170 and 171:
6 Conclusions The purpose of this F
- Page 172 and 173:
Because the secondary connector roa
- Page 183 and 184:
Appendix B Throughout the study, th
- Page 185 and 186:
From: missysdad@hotmail.com [mailto
- Page 187 and 188:
everyday traffic for doctor visits
- Page 189 and 190:
carpool, mass transit, or other. Wh
- Page 191 and 192:
decision makers are going to faced
- Page 193 and 194:
From: cwiercinski@sitelinespa.com S
- Page 195 and 196:
From: mar-e_trebilcock@msad51.org [
- Page 197 and 198:
From: Chris Baker, Harpswell [chris
- Page 199 and 200:
I thought that the Topsham Coastal
- Page 201 and 202:
From: charris@tidewater.net Sent: F
- Page 203 and 204:
Brunswick, ME 04011 207-729-0787 Al
- Page 205 and 206:
proposals it requires the most land
- Page 207 and 208:
From: cp348@aol.com [mailto:cp348@a
- Page 209 and 210:
Do NOT add to mailing list. Email s
- Page 211 and 212:
'inner' Pleasant Street is a barrie
- Page 213:
We are requesting that as part of t