03.01.2015 Views

Final Report - VHB.com

Final Report - VHB.com

Final Report - VHB.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.7.5 Option 3A<br />

Option 3A (Figure 4-8) is similar to Option 3 except for the treatment of the<br />

interchange-ramp intersections with Main Street. Option 3 incorporates new signals<br />

at each ramp intersection, whereas Option 3A integrates roundabouts at both<br />

intersections. Option 3A replaces the existing signalized Main Street/Coastal<br />

Connector intersection with a grade-separated interchange. The proposed design<br />

raises the grade and widens the Coastal Connector to four lanes, including bicycle–<br />

roadway-shoulder lanes that overpass a widened and reconstructed Main Street. The<br />

four lanes and bicycle–roadway shoulder lane-widening extends easterly through the<br />

reconstructed at-grade signalized intersection with Community Way/Village Drive<br />

to the existing four-lane section at the signalized connector road to the State Route 24<br />

(Middlesex Road) intersection. New interchange ramps provide free-flow access<br />

from the Coastal Connector to single-lane roundabout intersections with Main Street<br />

north and south of the proposed overpass bridge. The grade raise along the Coastal<br />

Connector is approximately 0.5 mile in length. It begins at the intersection of Union<br />

Park and Horton Place with the Coastal Connector and ends 0.2 mile west of the<br />

existing Community Way/Village Drive intersection. The Union Park/Horton Place<br />

intersection is reconfigured by extending the existing raised median westerly and<br />

allowing only right turns onto and off of Lewiston Road.<br />

The new Main Street interchange is configured as an urban half-cloverleaf-type with<br />

both the eastbound and westbound ramps located east of Main Street. This proposed<br />

interchange configuration takes advantage of the topography, existing cultural<br />

resources, and existing roadway infrastructure, including Monument Place and<br />

access to Mount Ararat High School. The ramps provide free-flow access to and from<br />

the Coastal Connector before transitioning to a three-lane roadway section that<br />

includes two travel lanes and a center left-turn lane to control access to abutting<br />

properties before intersecting with new roundabouts at Main Street.<br />

In Option 3A, Main Street is widened and reconstructed for approximately 0.6 mile<br />

beginning at approximately 0.1 mile north of Pleasant Street and ending in the<br />

vicinity of Forest Drive to the north. The widening includes one travel lane in each<br />

direction and a raised-median island that transitions to a left-turn lane (if required) at<br />

intersections. Sidewalks are constructed on both sides of Main Street and along the<br />

north side of the westbound ramps into the Mount Ararat High School <strong>com</strong>plex. The<br />

eastbound ramps intersect Main Street at a new roundabout opposite Monument<br />

Place. The westbound ramps intersect Main Street at a roundabout at the existing<br />

entrance to Mount Ararat High School. The high school access shifts to the east and<br />

connects to the westbound ramps. A new connector roadway intersects the new<br />

roundabout opposite the westbound ramps. The connector extends from Main Street<br />

westerly and southerly approximately 0.3 mile, connecting opposite Mallet Drive at<br />

the current signalized intersection with Lewiston Road. In Figure 4-8, a future<br />

multiuse trail is shown adjacent to the Coastal Connector and the proposed<br />

interchange ramps to provide continuity along the Coastal Connector corridor and<br />

connectivity to adjacent connecting roadways.<br />

Summary of Options 100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!