impacted property. However, using this data provides for a consistent valuation<br />
across all properties being considered. Therefore, it offers a reasonable surrogate to a<br />
more detailed property-appraisal process that would be conducted in a future project<br />
phase.<br />
The potential property acquisitions were divided into two primary categories: partial<br />
and full. The land values for partial takings were based on an average value per acre<br />
of land for all properties expected to be impacted by the option being evaluated. For<br />
full takings, which involve the <strong>com</strong>plete acquisition of land and/or buildings, the<br />
total assessed property value contained in the assessment database was used to<br />
estimate the impact. The assessment ratio of properties in Topsham reportedly was<br />
close to 100 percent at the time of this analysis; therefore, the estimated cost impacts<br />
of Topsham properties may reflect more closely potential purchase prices. However,<br />
according to the Town of Brunswick assessor, the assessment ratio of real property<br />
was estimated at only 60 percent of market value, which means that potential<br />
acquisition costs for project options in Brunswick could be significantly higher than<br />
the estimates provided.<br />
5.1.5 Environmental Evaluation – Resources and Methods<br />
Understanding the potential impacts on environmental and social resources is<br />
another important element of the Feasibility Study. To review these issues, an<br />
impact analysis of each option was conducted.<br />
As described in Chapter 2, available GIS data for the Study Area were obtained<br />
from various state agencies, MaineGIS, and the local level. In addition, existing<br />
environmental information was verified and updated in the field based on a<br />
reconnaissance-level effort. Information pertaining to ROW and property in the<br />
Study Area was obtained by 2008 and 2009 GIS parcel mapping, including<br />
assessment records, provided by the Towns of Brunswick and Topsham,<br />
respectively.<br />
Potential impacts then were calculated using a GIS overlay analysis, in which the<br />
footprint of each roadway option was overlaid onto the various environmental<br />
resources. Table 5.1-2 summarizes the metrics used to evaluate these resources.<br />
Impacts presented in this Feasibility Study must be interpreted cautiously. First,<br />
only direct impacts were considered. However, certain resources (i.e., historic<br />
buildings and historic districts) can be affected indirectly. Second, all identified<br />
impacts are preliminary estimates because they are based on preliminary rough<br />
grading without site-specific survey contours or detailed engineering. Third,<br />
resource mapping relies primarily on landscape-level environmental data rather<br />
than detailed site-specific studies that would be required during a formal NEPA<br />
or permit evaluation. The impacts, however, are still useful and appropriate for<br />
<strong>com</strong>paring the relative impacts of options within a strategy.<br />
Conclusions 142