TGQR 2010Q4 Report.pdf - Teragridforum.org
TGQR 2010Q4 Report.pdf - Teragridforum.org
TGQR 2010Q4 Report.pdf - Teragridforum.org
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Project-ID<br />
WBS<br />
OPMD<br />
TeraGrid AUS PY4-PY5 Project Plan<br />
Work Package Dependencies Planned<br />
Description<br />
Task<br />
Cross<br />
Area<br />
Start<br />
Date<br />
End<br />
Date<br />
Resources<br />
Name [%FTE]<br />
12/31/10 AD<br />
Status<br />
QSR <strong>2010Q4</strong> <strong>Report</strong> Values<br />
12/31/10 AD Notes<br />
9/30/10 AD<br />
Status<br />
QSR 2010Q3 <strong>Report</strong> Values<br />
9/30/10 AD Notes<br />
AUS 10 Area: Advanced User Support<br />
10.0 AUS Area Coordination<br />
AUS.Coord 10.0.2 O AUS Area Coordination PY5 Aug-09 Jul-10<br />
Majumdar [75%],Alameda[0%], Sanielevici<br />
[0%],Barth[0%], Cheesman[0%],Jundt[0%],<br />
Crosby[0%]<br />
Total 0.75<br />
10.1 Advanced Support Projects<br />
AUS.LIB 10.1.1 P Library Database PY5 Aug-09 Jul-10<br />
NICS Mark Fahey[10%], Intern[50%], HPC Ops<br />
Staff[10%]<br />
AUS.LIB 10.1.1.1 P implement wrappers for ld and aprun Aug-09 Oct-09 100% done 100% done<br />
AUS.LIB 10.1.1.2 P test wrappers; write mining scripts Nov-09 Jan-10 100% done 100% done<br />
AUS.LIB<br />
10.1.1.3 P<br />
wrappers in production mode; implement internal<br />
web interface; share beta release with other<br />
interested sites Feb-10 Apr-10 100% done<br />
AUS.LIB<br />
everything in production; begin using as a tool to<br />
10.1.1.4 O<br />
help manage software; prepare full release;<br />
share with other interested sites May-10 Jul-10<br />
AUS.LIB 10.1.1.5 O Library Database PY6 Aug-10 Jun-11<br />
AUS.MPI 10.1.2 P MPIg Support PY5 Aug-09 Jul-10<br />
NIU Undergrad[29%], Grad[75%], Nick<br />
Karonis[25%]<br />
Work with ASTA apps groups to port to MPIg on<br />
TG sites. Continue investigation of running apps<br />
AUS.MPI 10.1.2.1 P at full scale on Ranger. Aug-09 Oct-09<br />
AUS.MPI 10.1.2.2 P Attempt cross-site runs with MPIg on TG sites. Nov-09 Jan-10<br />
AUS.MPI 10.1.2.3 P<br />
100% done<br />
(since we<br />
postponed TG<br />
site runs)<br />
100% done<br />
(since we<br />
postponed TG<br />
site runs)<br />
The tracking database is in<br />
production; the internal web interface<br />
was dropped as a deliverable earlier,<br />
rather a suite of scripts to provide the<br />
same functionality.<br />
100% done<br />
This is being treated as an<br />
operational activity since the project<br />
part of this is completed.<br />
Due to unable to use MPIg on TG<br />
sites we are postponing the task of<br />
running full scale)<br />
Due to unable to use MPIg on TG<br />
sites cross-site runs on TG sitesis<br />
postponed for now<br />
95% done<br />
100% done<br />
(since we<br />
postponed TG<br />
site runs)<br />
100% done<br />
(since we<br />
postponed TG<br />
site runs)<br />
Work with largest TG RP providers to enable<br />
cross-site runs (this is being postponed due to<br />
unable to use MPIg on TG sites). Instead adding<br />
new task of integraing UPC and MPI for user<br />
apps Feb-10 Apr-10 20% done<br />
AUS.MPI 10.1.2.4 O<br />
Investigate intetrating clouds, possibly with<br />
Globus, to run MPIg jobs. May-10 Jul-10<br />
AUS.MPI 10.1.2.5 O MPIg Support PY6 Aug-10 Jun-11<br />
10.2 Advanced Support Operations<br />
AUS.ASTA 10.2.1 O Advanced Support TG Applications<br />
AUS.ASTA 10.2.1.2 O Advanced Support TG Applications PY5 Aug-09 Jul-10<br />
NCSA 0.6 FTE<br />
Jay Alameda [20%]<br />
Dodi Heryadi [0%]<br />
Seid Koric [0%]<br />
Rick Kufrin[25%]<br />
Sudhakar Pamidighantam [0%]<br />
Mark Straka[15%]<br />
Ahmed Taha[0%]<br />
Michelle Gower[0%]<br />
David Bock [0%]<br />
Mark Vanmoer [0%]<br />
PSC 3.15 FTE<br />
Mahin Mahmoodi [10%]<br />
Raghu Reddy [30%]<br />
John Urbanic [25%]<br />
Joel Welling [50%]<br />
Philip Blood [35%]<br />
Roberto Gomez [40%]<br />
Marcela Madrid [20%]<br />
David O'Neal[50%]<br />
Yang Wang [30%]<br />
Anirban Jana [25%]<br />
This is being treated as an<br />
operational activity since the project<br />
part of this is completed.<br />
80% done<br />
The tracking database is in<br />
production; the internal web interface<br />
was dropped as a deliverable earlier,<br />
rather a suite of scripts to provide the<br />
same functionality.<br />
The tracking database is in<br />
production and we are using it as a<br />
tool to manage software<br />
maintenance decisions. The license<br />
is still not complete (working with<br />
lawyers), but the code will be shared<br />
with any interested centers.<br />
Due to unable to use MPIg on TG<br />
sites we are postponing the task of<br />
running full scale)<br />
Due to unable to use MPIg on TG<br />
sites cross-site runs on TG sitesis<br />
postponed for now<br />
Continuted to learn about OpenMP.<br />
Worked with user to identify code<br />
where OpenMP could work.<br />
RPs have still yet to embrace cloud<br />
computing. Learning more about<br />
OpenMP. Scheduled to meet with<br />
user in November to start modifying<br />
their code.