A brief description of the team members involved, time frames and duties<br />
A listing of the requirements the software needs to meet<br />
• Perform an initial study<br />
o<br />
A subset of the team will perform an in depth study of the candidate<br />
• Create initial documents<br />
o<br />
The same subset of the team will generate several documents that will be used in<br />
the testing and insertion processes<br />
• Define the final test plan<br />
o<br />
o<br />
• Perform the tests<br />
o<br />
A formal test plan will be created by all team members that includes metrics,<br />
scripts and features to be evaluated<br />
Subject matter experts (SME) will be used as available so that the tests are<br />
appropriate and accurate<br />
The testing will be performed on multiple systems by more than one team<br />
member for rigor<br />
• Generate the final reports<br />
o<br />
o<br />
Internal reports will be generated on the testing. External reports will be<br />
generated as the testing of the candidate merits<br />
Any final report will be publicly available through the XTED database<br />
The Plan to do an evaluation of the TEP<br />
The evaluation tests were completed and demonstrated some areas that needed improvement.<br />
Those changes have been made to the process. We have coordinated with the TIS group on the<br />
information they require, and have documented that. We are coordinating with the XTED group<br />
on the changes that we need in the database.<br />
Goals<br />
Our goal for this quarter is to have the formal version of the process accepted by all of TIS in<br />
January and start testing real candidates thereafter. We are also coordinating on the software<br />
candidate identification process with the rest of the group such that we receive a preliminary set<br />
of candidates. We will also obtain a list of available resources and personnel for testing. During<br />
this quarter, we will need to note the rate of testing, so that we can accurately estimate the amount<br />
of future testing that can be done with TIS resources. We will also identify any changes needed in<br />
the process which are noted during “real-world”testing.<br />
9.1.4 Technology Insertion Support<br />
The Technology Insertion Support (YNT) team facilitates transition of supported and<br />
recommended technologies from evaluation to deployment by TeraGrid and XD service providers<br />
and users. YNT works with the evaluation teams to ensure that deployment, design, installation,<br />
configuration, maintenance, and usage methods for supported and recommended technologies are<br />
sufficiently documented, together with validation tests and usage examples.<br />