A brief description of the team members involved, time frames and duties<br />

A listing of the requirements the software needs to meet<br />

• Perform an initial study<br />

o<br />

A subset of the team will perform an in depth study of the candidate<br />

• Create initial documents<br />

o<br />

The same subset of the team will generate several documents that will be used in<br />

the testing and insertion processes<br />

• Define the final test plan<br />

o<br />

o<br />

• Perform the tests<br />

o<br />

A formal test plan will be created by all team members that includes metrics,<br />

scripts and features to be evaluated<br />

Subject matter experts (SME) will be used as available so that the tests are<br />

appropriate and accurate<br />

The testing will be performed on multiple systems by more than one team<br />

member for rigor<br />

• Generate the final reports<br />

o<br />

o<br />

Internal reports will be generated on the testing. External reports will be<br />

generated as the testing of the candidate merits<br />

Any final report will be publicly available through the XTED database<br />

The Plan to do an evaluation of the TEP<br />

The evaluation tests were completed and demonstrated some areas that needed improvement.<br />

Those changes have been made to the process. We have coordinated with the TIS group on the<br />

information they require, and have documented that. We are coordinating with the XTED group<br />

on the changes that we need in the database.<br />

Goals<br />

Our goal for this quarter is to have the formal version of the process accepted by all of TIS in<br />

January and start testing real candidates thereafter. We are also coordinating on the software<br />

candidate identification process with the rest of the group such that we receive a preliminary set<br />

of candidates. We will also obtain a list of available resources and personnel for testing. During<br />

this quarter, we will need to note the rate of testing, so that we can accurately estimate the amount<br />

of future testing that can be done with TIS resources. We will also identify any changes needed in<br />

the process which are noted during “real-world”testing.<br />

9.1.4 Technology Insertion Support<br />

The Technology Insertion Support (YNT) team facilitates transition of supported and<br />

recommended technologies from evaluation to deployment by TeraGrid and XD service providers<br />

and users. YNT works with the evaluation teams to ensure that deployment, design, installation,<br />

configuration, maintenance, and usage methods for supported and recommended technologies are<br />

sufficiently documented, together with validation tests and usage examples.<br />