Allocation Usage 1,039 8,980<br />
GSI-SSH 491 6,460<br />
System Accounts 671 5,783<br />
Data Collections 2,228 4,238<br />
System Monitor 486 3,150<br />
Science Gateways 28 1,397<br />
Consulting 216 1,169<br />
Add/Remove User Form 189 722<br />
QBETS Wait Time 40 625<br />
Karnak Prediction 46 620<br />
My Jobs 154 510<br />
QBETS Queue Prediction 395 395<br />
Ticketing System 143 320<br />
User Profile 184 280<br />
Feedback 177 177<br />
6.3 Allocations Process and Allocation Management<br />
This objective encompasses the allocations process, both for Startup/Education allocations as well<br />
as the merit-review TRAC Research request process, the POPS system for request handling and<br />
management, mechanisms by which allocation PIs manage allocations through transfers,<br />
extensions and so on, and interfaces by which allocation PIs manage the users who are authorized<br />
to use their allocations. Operationally, this objective includes the TRAC review process, the<br />
Startup allocations review and decision process, and the maintenance and operations of the POPS<br />
system.<br />
The allocation staff continues to receive in excess of two new/renewal startup requests each day.<br />
TeraGrid received 206 Startup requests (168 approved) and 12 Education requests (12 approved).<br />
Table 6-2 shows the overall allocations management activity handled by POPS and the<br />
allocations staff. Note that for Transfers, the table shows only the positive side of the transaction<br />
to show the total transfer level; there is a corresponding negative amount, adjusted for resource<br />
exchange rates.<br />
Table 6-2. POPS Requests and Awards, Q4 2010<br />
Research Startup Education<br />
# SU # SUs # SU # SUs # SU # SUs<br />
Req Requested Awd Awarded Req Requested Awd Awarded Req Requested Awd Awarded<br />
New 58 266,335,446 52 65,028,339 177 35,790,440 144 24,470,244 9 1,343,026 9 1,143,029<br />
Prog. <strong>Report</strong> 7 10,874,082 7 8,180,451 n/a n/a<br />
Renewal 61 343,166,885 58 209,659,993 29 6,438,085 24 5,501,386 3 193,090 3 193,090<br />
Advance 23 28,700,768 23 11,658,507 n/a n/a<br />
Justification 5 8,225,558 4 4,726,478 0 0 0 0 0 0 0 0<br />
Supplement 16 42,771,601 13 13,336,601 22 1,905,034 19 1,580,004 1 60,000 1 60,000<br />
Transfer 106 48,982,063 97 46,917,813 30 943,360 27 787,526 3 120,000 2 70,000<br />
Extension 43 n/a 40 n/a 44 n/a 41 n/a 0 n/a 0 n/a<br />
6.4 RP Integration and Information Sharing<br />
The TGCDB continues to be successfully monitored via Inca. The failover system continues to<br />
sync with the production TGCDB server. In a GIG coordinated project spanning multiple RPs,<br />
staff from NCSA, PSC and SDSC working as a team successfully upgraded the TGCDB and<br />
failover servers to a new version of postgreSQL. In doing so, significant performance<br />
enhancements were made available as well as providing an ongoing supported version of the db<br />
for TeraGrid.<br />
66