09.02.2015 Views

Feasibility Study of Proposed Tourism Dev in Shewula, NE ...

Feasibility Study of Proposed Tourism Dev in Shewula, NE ...

Feasibility Study of Proposed Tourism Dev in Shewula, NE ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ma<strong>in</strong> element here is public consultation and participation, where the key l&APs are<br />

identified and consulted. This has been carried out at a generic level, with some<br />

specific <strong>in</strong>itial assessments. Further work should be carried out once the concept for<br />

the tourism development is f<strong>in</strong>alised.<br />

b) Integration <strong>of</strong> <strong>in</strong>formation<br />

The f<strong>in</strong>d<strong>in</strong>gs <strong>of</strong> the Scop<strong>in</strong>g study, and any other relevant <strong>in</strong>formation from a<br />

literature review, should be <strong>in</strong>tegrated to produce the assessment component <strong>of</strong> the<br />

IEE.<br />

Based on the <strong>in</strong>formation obta<strong>in</strong>ed from evaluat<strong>in</strong>g the possible impacts on the<br />

broader environmental components, the study team recommends that the f<strong>in</strong>al<br />

evaluation should assess the potential impact <strong>in</strong> terms <strong>of</strong> the significance <strong>of</strong> the<br />

identified impacts and their status. Box 5.2 conta<strong>in</strong>s a description <strong>of</strong> how the<br />

significance and status <strong>of</strong> impacts could be described when assess<strong>in</strong>g the tourism<br />

development. The detail to be presented <strong>in</strong> the f<strong>in</strong>al IEE depends on the scale <strong>of</strong> the<br />

development, and the resultant significance <strong>of</strong> the impacts on the receiv<strong>in</strong>g<br />

environment.<br />

5.4.2.3. Recommendations for the Comprehensive Mitigation Plan<br />

A Comprehensive Mitigation Plan (CMP) for the construction and operational phases<br />

<strong>of</strong> the project is required for Category 2 projects accord<strong>in</strong>g to the Regulations. A CMP<br />

could <strong>in</strong>clude all or a comb<strong>in</strong>ation <strong>of</strong> the follow<strong>in</strong>g, depend<strong>in</strong>g on the sensitivity <strong>of</strong> the<br />

receiv<strong>in</strong>g environment and on the scale <strong>of</strong> the development:<br />

• The plan for implementation <strong>of</strong> the CMP dur<strong>in</strong>g the construction phase;<br />

• Environmental tra<strong>in</strong><strong>in</strong>g for the Contractors staff; and<br />

• Environmental audits <strong>of</strong> the operational phase.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!