Chapter 9 • The Way Forward<br />

9.1. INTRODUCTION<br />

This chapter outl<strong>in</strong>es a way forward for tourism and conservation development <strong>in</strong> the<br />

<strong>Shewula</strong> area. The chapter deals with the follow<strong>in</strong>g aspects:<br />

• The development process s<strong>in</strong>ce the fieldwork period ended <strong>in</strong> mid-March 1999 is<br />

briefly described.<br />

• An alternative development approach that differs from what has occurred <strong>in</strong><br />

<strong>Shewula</strong> is <strong>in</strong>troduced, with the specific aim <strong>of</strong> improv<strong>in</strong>g community participation.<br />

• Some guid<strong>in</strong>g statements have been formulated with the aim <strong>of</strong> assist<strong>in</strong>g a<br />

transition <strong>in</strong>to this suggested alternative development approach.<br />

• A sequence <strong>of</strong> discrete activities has been suggested, with the aim <strong>of</strong> assist<strong>in</strong>g<br />

the implementation <strong>of</strong> the suggested alternative development approach.<br />

9.2. WHAT HAS HAPPE<strong>NE</strong>D SINCE THE END OF THE<br />

FIELDWORK PERIOD, MID-MARCH 1999<br />

This section deals with the some important events that have occurred <strong>in</strong> the<br />

development process <strong>in</strong> <strong>Shewula</strong> s<strong>in</strong>ce mid-March 1999.<br />

1. A workshop was held on the 15 March 1999, draw<strong>in</strong>g the fieldwork to a close. At<br />

this workshop, attended by some key role-players, it was suggested that a twophase<br />

development be <strong>in</strong>vestigated. The first phase would <strong>in</strong>clude a smaller<br />

tourism development be located on the Lubombo escarpment, followed by a<br />

second more extensive tourism development close to the Umbuluzi River 131 .<br />

2. A submission to the British Council, substantiat<strong>in</strong>g why an extension would be<br />

required for the <strong>Shewula</strong> tourism development. It was recommended that a three<br />

to six month period would provide more time to address capacity build<strong>in</strong>g needs<br />

with<strong>in</strong> the <strong>Shewula</strong> community. This was reflected <strong>in</strong> the revised proposal<br />

submitted to British Council (refer to po<strong>in</strong>t 4).<br />

3. The study team undertook an <strong>in</strong>itial assessment <strong>of</strong> the orig<strong>in</strong>al project<br />

proposal 132 , which concluded that the proposed tourism development was not<br />

feasible. The reasons for this conclusion <strong>in</strong>cluded a lack <strong>of</strong> ownership <strong>of</strong> the<br />

proposed development and the m<strong>in</strong>imal amount <strong>of</strong> f<strong>in</strong>ancial, market<strong>in</strong>g or tourism<br />

plann<strong>in</strong>g that had been completed by those driv<strong>in</strong>g the process. It was felt that an<br />

unnecessarily high level <strong>of</strong> risk was be<strong>in</strong>g taken. It was <strong>in</strong>tended that this<br />

assessment would guide subsequent project developments.<br />

4. Members <strong>of</strong> the UCA submitted a revised proposal to BC 133 . Due to deadl<strong>in</strong>es set<br />

by the British Council, this revised proposal was submitted before the BCSC<br />

could consider the comments from the study team regard<strong>in</strong>g the orig<strong>in</strong>al<br />

Refer to Appendix 1 for the proceed<strong>in</strong>gs <strong>of</strong> this workshop held at the Tambankulu Club. " 2<br />

Refer to Chapter 3 for a summary <strong>of</strong> the orig<strong>in</strong>al proposal submitted to the British Council. 133<br />

Refer to Appendix 6 for the revised proposal submitted to the British Council.<br />