Who HR May Hire Under a PSA-Ltd<br />

For employment under a PSA-Ltd, an individual must meet these requirements:<br />

A. A non-US Citizen without a US permanent resident alien (green card) status, or US Citizenship as a<br />

dual national; and<br />

B. Eligible for legal employment in the host country (which may require having a work permit, residency<br />

permit, or both); and<br />

C. Not a current USG direct-hire or contract employee (PSA/PSC), nor providing services through a<br />

GSO non-personal services procurement contract; and<br />

D. Selected on the basis of education, experience, and suitability for the work to be performed.<br />

How Long an Individual May Work Under a PSA-Ltd<br />

PSA-Ltd is a short-term employment mechanism not to exceed 30 work days per calendar year. The<br />

supervisor may schedule the 30 work days all at once, or spread them out within the calendar year. PSA-<br />

Ltd agreements that go beyond the fiscal year (from October 1-September 30) are compensated in the<br />

fiscal year when the work is performed.<br />

HR may not execute, renew, or extend the PSA-Ltd beyond the maximum 30 work days for the calendar<br />

year.<br />

HR counts each day worked (not the number of hours) as 1 day until the employee reaches the 30-work<br />

day maximum for the calendar year.<br />

HR may not carry over a PSA-Ltd for an employee into the new fiscal year if the employee has not<br />

worked the maximum 30 work days. Rather, HR must process a new PSA-Ltd for the employee covering<br />

October 1-December 31 of the new fiscal year to account for the remainder of days not worked within the<br />

30 day maximum, as appropriate.<br />

Examples, using a Monday through Friday workweek:<br />

Example 1: April 3, 2007 - May 11, 2007<br />

Total work days for fiscal year: 30 work days (the maximum for the current calendar year)<br />

---------------------------------------------------<br />

Example 2: December 12-14, 2005 = 3 work days<br />

February 16, 2006 = 1 work day<br />

June 19-30, 2006 = 10 work days<br />

July 5-7, 2006 =<br />

3 work days<br />

August 14-25, 2006 = 10 work days<br />

Total work days for calendar year:<br />

27 work days