11.07.2015 Views

Leica TPS700 Series Field Manual - Surveying Equipment

Leica TPS700 Series Field Manual - Surveying Equipment

Leica TPS700 Series Field Manual - Surveying Equipment

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Area ApplicationMeasurement (1):PtNr(1) = Point IDHz(1) = Horizontal angleV(1) = Vertical angle(1) = Measured slopedistancehr(1) = Reflector heightMeasurement (n):PtNr(n) = Point IDHz(n) = Horizontal angleV(n) = Vertical angle(n) = Measured slopedistancehr(n) = Reflector heightResults:NoPts = Number of pointsArea = AreaPerim. = Perimeter of areaFree Station ApplicationTarget Point (1):PtID(1) = Point IDE(1) = EastingN(1) = NorthingH(1) = HeightMeasurement (1):PtNr(1) = Point IDHz(1) = Horizontal angleV(1) = Vertical angle(1) = Measured slopedistancehr(1) = Reflector heightTarget Point (n):PtID(n) = Point IDE(n) = EastingN(n) = NorthingH(n) = HeightMeasurement (n):PtNr(n) = Point IDHz(n) = Horizontal angleV(n) = Vertical angle(n) = Measured slopedistancehr(n) = Reflector heightStation results:Stn = Station numberE = Station co-ordinate(Easting)N = Station co-ordinate(Northing)H = Station heighthi = Instrument height161

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!