11.07.2015 Views

Leica TPS700 Series Field Manual - Surveying Equipment

Leica TPS700 Series Field Manual - Surveying Equipment

Leica TPS700 Series Field Manual - Surveying Equipment

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

40Procedure:1. in the "SETSTATION" display starts theheight transfer and carries outa point search using thewildcard criterion (*), i.e. thelast point measured/entered isdisplayed first, fixed pointsbefore measurements.2. Enter the required pointnumber for the target point orpage through the list of pointsfound using .3. / / :Measurement to the selectedtarget point.4. : Display of the results.HEIGHT TRANSFER RESULTSStn : STN1PtID : PF22H0 I : 436.719 mH0 II : 435.065 mMean : 435.892 m The following are displayed:• Station name• Point ID of the target point• Calculated station height (H0)from measurement in thecorresponding telescope face.If measurements are performedin both telescope face, themeasurements are averaged.If the calculated H0values deviate betweenthe first and second telescopeface by more than 10 cm fromanother, an error message isdisplayed.The message shouldbe checked. H0_middle iscalculated in any case.Back to the SET STATIONdisplay, H0 is set and only savedwith .Starts a new measurementEnds the height transfer, returnsto SET STATION display (H0 isnot set).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!