11.07.2015 Views

Leica TPS700 Series Field Manual - Surveying Equipment

Leica TPS700 Series Field Manual - Surveying Equipment

Leica TPS700 Series Field Manual - Surveying Equipment

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Orientation results:PtID(1) = Point ID of thefirst target pointBrg= Calculated azimuthbetween the stationco-ordinates and thefirst target point(based on the telescopeface in whichorientation wasperformed)NoPts = Number of targetpoints usedHzCor = Hz circle correctionStDevFace= Standard deviation ofthe Hz circlecorrection= Telescope face inwhich orientation wasperformed.Reference Line Application• Reference lineMeasurement (1):PtID = Point IDHzV= Horizontal angle= Vertical angle= Measured slopedistancehr = Reflector heightTarget Point (1):PtID = Point IDE = EastingN = NorthingH = HeightMeasurement (2):PtID = Point IDHz = Horizontal angleV = Vertical angle= Measured slopedistancehr= Reflector heightTarget Point (2):PtID = Point IDE = EastingN = NorthingH = HeightTransformation Parameters:Line = Longitudinal offsetOffs = Parallel offsetHoff = Height offsetRot = Rotation• Reference Line Measurement:PtID = Point IDHz = Horizontal angleV = Vertical angle= Slope distancehr = Reflector height163

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!