11.07.2015 Views

AFS Foundry Sand Testing Equipment Operating Instructions Manual

AFS Foundry Sand Testing Equipment Operating Instructions Manual

AFS Foundry Sand Testing Equipment Operating Instructions Manual

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RIDSDALE CALIBRATION EQUIPMENTPROVING RINGITEST PROCEDURE(a)(b)(c)(d)(e)Locate the two studs into the lower compression head position of the Universal <strong>Sand</strong>Strength Machine.Zero the dial gauge by rotating the bezel and lock in position using the lockingmechanism if required.Place the gauge between the studs and locate the pivots on the steel ring into thestuds.Using the table of certified readings provided with the instrument, start the machineand stop at the appropriate points as detailed on the table. The tolerance allowed onthese readings is ± 1 division, ie .001 inches.Reverse the machine using one of the micro switches and unload the Proving Ring.113

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!