11.07.2015 Views

AFS Foundry Sand Testing Equipment Operating Instructions Manual

AFS Foundry Sand Testing Equipment Operating Instructions Manual

AFS Foundry Sand Testing Equipment Operating Instructions Manual

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RIDSDALE-DIETERT PERMEABILITY METER (<strong>AFS</strong>) (cont’d)IIIINSTALLATION(a)(b)(c)(d)(e)(f)Place the Permeability Meter on a level bench and fill tank with water to WATERLEVEL mark.Rotate knurled ring clockwise and remove the aluminium cover from the centre post.Open priming cup and pour distilled water into it until the water appears in the glasstube below line ‘O’. Any initial resistance to the entry of the water can be overcomeby pressing the ball of the thumb on the open end of the priming cup.* Close the tap.With the manometer scale on the dial in the vertical position, turn the adjusting screwuntil the zero on the dial is level with the water in the manometer tube.Turn air valve to ‘VENT’ and raise air drum until it is above the water level. Turnvalve to ‘CLOSED’ and allow the drum to descend slowly into the water. Turn the airvalve gradually towards ‘VENT’ and allow the air drum to descend until the ‘X’ markon the drum is level with the top edge of the tank. Turn valve to ‘CLOSED’.Place the aluminium cover on the centre post and form an air-tight seal by rotatingthe knurled ring in an anti-clockwise direction.Turn the air valve to a position midway between ‘CLOSED’ and ‘VENT’. The waterlevel in the manometer should now read 10.0 cm pressure and remain steady. If thedrum should descend this would indicate air leaks in the system.* The addition of a small amount of detergent will facilitate the filling of the manometer tube.IVTEST PROCEDUREDIN Standard Time and Pressure Method(a)(b)(c)(d)Check that the open orifice is in position in the centre post.Prepare a standard specimen of sand. Before stripping from tube, place in positionon the centre post and seal by rotating the knurled ring anti-clockwise.Raise the air drum as in Section III, paragraph (d).Allow the air drum to descend by turning the air valve to a position midway between‘CLOSED’ and ‘VENT’. Time the descent of the air drum between the zero and the2000 ml mark with a stop watch and record the pressure indicated on the manometerduring the descent of the drum.(e) Calculate the permeability by applying the formula given in Section I.65

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!