AFS Foundry Sand Testing Equipment Operating Instructions Manual
AFS Foundry Sand Testing Equipment Operating Instructions Manual
AFS Foundry Sand Testing Equipment Operating Instructions Manual
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
RIDSDALE-DIETERTTRANSVERSE RAMMING ACCESSORY (<strong>AFS</strong>) (cont’d)IVTEST PROCEDURE (cont’d)(c)(d)(e)(f)Raise the ramming head using the left-hand side cam and place the core box inposition on the rammer. Carefully lower the plunger into the hopper and line up.Ram with four blows.Raise the plunger, turn the core box assembly through approximately 45° and allowthe weight of the ram to rest on top of the hopper. Insert the knife from one end ofthe assembly and cut off the core specimen.Remove the core box assembly from the rammer and lift off hopper. Set the corebox with drying plate on the bench and rap lightly. Carefully remove the two halvesof the core box from the specimen.Dry or cure the specimen and cool before testingNOTE:The use of a Mould Release Agent will assist in the clean stripping of the specimens.VRECOMMENDED SPARESPart NoDescription367 Drying Plate368 Cut-off Knife.50