11.07.2015 Views

AFS Foundry Sand Testing Equipment Operating Instructions Manual

AFS Foundry Sand Testing Equipment Operating Instructions Manual

AFS Foundry Sand Testing Equipment Operating Instructions Manual

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RIDSDALE GAS DETERMINATOR (cont’d)(b)Chart Recorder (cont’d)MANUFACTURERS :ARKON INSTRUMENTS LTD.(T.E.M.E.),2A THE CROFT,CROFT STREETLECKHAMPTONGLOS., GL53 0ED(Tele:) 01242 228745.(c)Temperature ControllerSee Eurotherm <strong>Operating</strong> <strong>Manual</strong>.IVTEST PROCEDURETURN on the cooling water and switch on the furnace.SET the temperature controller to the required temperature (850 °C) and allow the furnace toattain equilibrium at this temperature.INTRODUCE a weighed quantity (1 – 2 g) of sand into one of the special thin-walled coppersample tubes (3 in long x ¼ in diameter, closed at one end) and plug the open end withignited aluminium silicate fiberfax.UNSCREW the spring-gun assembly and insert the sample tube with the gun in the ‘loaded’position.REPLACE the gun assembly and pass a stream of oxygen-free nitrogen through theapparatus at a rate of about 1 litre per minute with the “GAS INLET” and “EXHAUST” taps inthe open position and the “RECORDER” tap shut. After two minutes all oxygen (or gasesfrom a previous test) should have been expelled.SHUT OFF the supply of nitrogen, then :-(a)(b)(c)(d)(e)Turn “GAS INLET” to “shut”.Turn “RECORDER” to “open” and wait for two minutes to allow the gas in the tube toattain furnace temperature.Turn “EXHAUST” to “shut”.Switch on the recorder.Inject the sample tube into the hot zone.118

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!