12.07.2015 Views

Logano plus SB315, SB615, SB745 - Buderus

Logano plus SB315, SB615, SB745 - Buderus

Logano plus SB315, SB615, SB745 - Buderus

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9 Installation9.4 Information on installationPipework installation• Ensure the boiler is vented.• In open vented systems, route pipework with a risetowards the diaphragm expansion vessel.• Do not design reductions in the pipework inhorizontal lines.• Ensure pipework is not subject to mechanical stress.Electrical installation• Permanent connection required to VDE 0100,VDE 0116 and VDE 0722. It may be necessary toadhere to local regulations.• Ensure cables and capillaries are routed carefully.Commissioning• Check the quality of the fill and top-up water( page 41).• Flush the entire heating system before filling.Leak test• Carry out leak test to standard DIN 18380. The testpressure is 1.3 times the operating pressure, butshould be at least 1 bar.• In sealed unvented systems, separate the safety valvefrom the diaphragm expansion vessel before thepressure test.Handover• When handing over the system, show the user how itfunctions and how to operate it.• Give the technical documentation to the user.• Explain the maintenance conditions ( page 37) andrecommend a maintenance and inspection contract.80Technical guide Floor standing gas/oil condensing boilers <strong>Logano</strong> <strong>plus</strong> <strong>SB315</strong>, <strong>SB615</strong>, <strong>SB745</strong> – 6 720 802 589 (2012/01)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!