2003 - Annual Report - <strong>EDP</strong><br />

remote-regulation modules were also ordered, which<br />

are set to come into operation during <strong>2004</strong>.<br />

To render feasible the Despatch by the Trading area<br />

of the <strong>EDP</strong> power <strong>plan</strong>ts belonging to SENV, the<br />

implementation of the real-time Despatch system<br />

was adjudicated to two suppliers in February 2003,<br />

making redundant a configuration of systems and<br />

communications.<br />

• Trading In<strong>for</strong>mation System (SIT)<br />

Within the scope of the SIT, attention is drawn to the<br />

following:<br />

a) migration of the SIT to an autonomous plat<strong>for</strong>m as<br />

a result of the separation of the Trading area of<br />

<strong>EDP</strong> Energia;<br />

b) development of new modules <strong>for</strong> operation in new<br />

markets (e.g. France) <strong>for</strong> establishment of financial<br />

contracts and <strong>for</strong> integration of in<strong>for</strong>mation on fuel<br />

markets, and perfecting existing modules to bring<br />

them into line with <strong>business</strong> requirements;<br />

c) introduction of data security and audit mechanisms;<br />

d) start of the process of interconnection of the<br />

SET with the risk-management model and<br />

establishment of the interface between the SIT and<br />

the Dispatch System; and<br />

e) development of a decision-support system (data<br />

warehouse) allowing centralisation of the Trading<br />

management in<strong>for</strong>mation, while decentralising<br />

access thereto.<br />

Web Communication with Generation (MCP)<br />

A system of communication with the SENV generation<br />

was developed, based on a Web philosophy interfacing<br />

with the Trading in<strong>for</strong>mation system. The system will be<br />

subject to a second stage of development during <strong>2004</strong><br />

designed to accommodate the extension of new<br />

Generation units to the SENV.<br />

Plat<strong>for</strong>m of exchange of in<strong>for</strong>mation with<br />

HidroCantábrico<br />

With due regard <strong>for</strong> the limits of legal autonomy of the<br />

two institutions and with a view to increasing cooperation<br />

between the Trading areas of <strong>EDP</strong> and of<br />

HidroCantábrico, a common in<strong>for</strong>mation sharing<br />

plat<strong>for</strong>m was set up during October 2003 to share<br />

in<strong>for</strong>mation on market data and indicators.<br />

Intranet <strong>for</strong> the Trading area<br />

The Trading area Intranet was implemented and came<br />

into operation in 2003, putting the knowledge<br />

management strategy into practice through a simple,<br />

fast and efficient means of communication.<br />

Geo<strong>EDP</strong> Project – Geo-referenced In<strong>for</strong>mation<br />

Systems<br />

<strong>EDP</strong> Distribuição went ahead with the implementation<br />

of the Geo<strong>EDP</strong> project started in 2001, developed in<br />

close partnership with the EDINFOR Group’s IT-Geo. It<br />

consists of a multi-project framework directed at spatial<br />

in<strong>for</strong>mation management and systems integration, the<br />

aim being to provide widespread access to a range of<br />

functions and data warehouses, to support the new<br />

work cycle and the different <strong>business</strong> management<br />

processes and flows of In<strong>for</strong>mation.<br />

The Geo<strong>EDP</strong> project is centred on innovative<br />

modernisation of the systems of the technical areas, with<br />

particular focus on applied development and on the link<br />

with university research – accounting <strong>for</strong> the greater part<br />

of the investment in R&D at <strong>EDP</strong> Distribuição.<br />

Full implementation of the Geo<strong>EDP</strong> will, in terms of<br />

internal operations, cause a radical change of work<br />

methods in the technical area (increased effectiveness)<br />

and will support optimised redesign of corporate<br />

processes (increased efficiency), and its effects are already<br />

clear to see. The expected benefits will be underpinned by<br />

an improvement of the response capacity to customer<br />

needs, through speed, efficiency, and quality of service.<br />

Total investment in the programme will be in the order of<br />

€100 million over 10 years, with investment during 2003<br />

having amounted to about €12 million. The cost/benefit<br />

analysis of the programme suggests an IRR of between<br />

30% (a very conservative scenario) and 60% (optimistic<br />

scenario), with a positive contribution to net income <strong>for</strong><br />

the year in 2003. The permanent monitoring indicator,<br />

based on level of use, outper<strong>for</strong>med the best expectations<br />

in 2003.<br />

In keeping with a concerted strategy of progressive<br />

provision of in<strong>for</strong>mation and innovative functions,<br />

the electricity grid<br />

data warehouse was<br />

considerably enlarged<br />

58/59