29.11.2012 Views

business plan for 2004 - EDP

business plan for 2004 - EDP

business plan for 2004 - EDP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

during 2003 by means of field in<strong>for</strong>mation surveys that<br />

accompanied the applied development projects, namely:<br />

RedeActiva (implementation of a new incident<br />

management system), GeoProjectar (strategic to support<br />

management in<strong>for</strong>mation), integration with the SAP<br />

plat<strong>for</strong>m systems, integration with specific management<br />

(Genesys) and <strong>plan</strong>ning systems, and an integrated-<br />

-environment <strong>plan</strong>ning and optimisation system (dPlan).<br />

As an indication of the evolution it may be said that, in<br />

addition to the entire characterisation of the high voltage<br />

electricity grid, the medium voltage electricity grid<br />

in<strong>for</strong>mation register already covers the infrastructure in<br />

respect of 80% of the customers and 60% of the country.<br />

The swift incorporation of simplified access to in<strong>for</strong>mation<br />

in normal job routines, leading to the sustained returns on<br />

the investment, is clearly reflected in the level of access to<br />

e-SIT (providing simple to use Intranet workstations<br />

giving widespread access to all the in<strong>for</strong>mation of the<br />

technical in<strong>for</strong>mation system), which, exceeding the most<br />

optimistic expectations, received 47,000 visits during 2003,<br />

four times the number seen in 2002.<br />

Integrated Management Support System (SIAG)<br />

The SIAG reached cruising speed during 2003, including<br />

several improvements and received a new version of the<br />

BW (Business Warehouse) plat<strong>for</strong>m.<br />

New developments were introduced with a view to<br />

generate automatic reports on invoicing drivers and service<br />

level indicators. The SAP Human Resources module was<br />

adapted to new processes. The invoice scanning system<br />

was developed, which, in addition to electronic filing,<br />

provides SAP users with an image of these documents,<br />

avoiding the need <strong>for</strong> their physical circulation.<br />

A start was also made to the development of a new<br />

accounting consolidation module.<br />

Shared Services Plat<strong>for</strong>m Systems – <strong>EDP</strong> Valor<br />

A start was made to the ValorNet – Vision of the Future<br />

project <strong>for</strong> the in<strong>for</strong>mation systems and technologies area,<br />

centred on three lines of intervention, <strong>EDP</strong> Valor Portal,<br />

Service Management, and Reference Architecture, allowing<br />

lines of evolution to be established <strong>for</strong> the in<strong>for</strong>mation<br />

systems in the technology and processes area better suited<br />

to the Company’s strategic objectives, particularly with<br />

regard to <strong>business</strong>, efficiency and service quality goals.<br />

During the third quarter of 2003, <strong>EDP</strong> Valor developed<br />

and implemented the GI System, an in<strong>for</strong>mation system<br />

designed to support installations management with a<br />

Web interface allowing customers to provide in<strong>for</strong>mation<br />

of events and consultation of their current status on a self-<br />

-serve basis.<br />

<strong>EDP</strong> Valor made a start to the development of an<br />

in<strong>for</strong>mation system <strong>for</strong> the property management area<br />

with a view of providing the Company with a data<br />

warehouse on the Group’s properties, and an integrated<br />

2003 - Annual Report - <strong>EDP</strong><br />

set of support tools <strong>for</strong> property management, space<br />

management, construction and repair works, and<br />

premises management activities.<br />

Shutdown of Inherited Systems<br />

Continuity was given during 2003 to the preparatory<br />

work <strong>for</strong> safeguarding of historic in<strong>for</strong>mation and to the<br />

shutting down of the systems replaced by the SAP<br />

plat<strong>for</strong>ms. During 2003 nine applications were shut<br />

down.<br />

>> 9.2 Control and Security<br />

In the control and security area the focus is on:<br />

• The development and rolling out of an access<br />

management application, the aim of which is tight<br />

control of internal and external employee access,<br />

particularly <strong>for</strong> active employees and contributing to<br />

the minimisation of the number of software licenses;<br />

• Introduction of controls of the frequency of use of<br />

systems, blocking access by employees with a low use-<br />

-frequency index;<br />

• Preparation and publication on the Group Intranet of<br />

new rules governing the use of electronic mail and the<br />

Internet; and<br />

• Per<strong>for</strong>mance of security audits on the server rooms and<br />

on the WAN network nodes, leading to various<br />

recommendations now being implemented.<br />

>> 9.3 Distributed Systems (LAN and Desktop)<br />

The whole of the management of the distributed systems<br />

and of the server rooms was transferred to the IT-Log,<br />

marking the first steps to the outsourcing of the<br />

management of assets of this class.<br />

Centralised procurement was introduced <strong>for</strong> this class of<br />

assets and a start was made to the project designed to<br />

reduce and consolidate the server rooms with a view to<br />

greater security and to better local network management<br />

capacity.<br />

>> 9.4 In<strong>for</strong>mation Technology Reorganisation<br />

A project was launched to redefine the in<strong>for</strong>mations system<br />

sourcing strategy with the co-operation of an international<br />

consultant, to provide the <strong>EDP</strong> with contracting conditions<br />

in keeping with best market practices. At the same time,<br />

EDINFOR was reorganised to supply <strong>EDP</strong> under Brand<br />

Services Company conditions, and a new <strong>EDP</strong>/EDINFOR<br />

relationship matrix was established.<br />

This work led to a new contracting model based on the<br />

establishment of measurable IT units allowing the<br />

evaluation and payment of resources actually consumed<br />

by <strong>EDP</strong>, compatible with the market through the <strong>plan</strong>ned<br />

benchmarking activities.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!