• The larger number of environment tests ranging from<br />
characterisation of the water of the majority of the<br />
country’s reservoirs to the mobile laboratory used to<br />
monitor air conditions, which required investment in<br />
laboratory equipment;<br />
• The annual campaign to determine the state of<br />
trans<strong>for</strong>mers by means of analysis of their oils and the<br />
introduction of new laboratory techniques, particularly<br />
the analysis of oil by infrared spectrophotometry and<br />
by high-pressure, high-resolution chromatography, as<br />
well as characterisation of the state of the sulphur<br />
hexafluoride in circuit breakers;<br />
• At the level of the high voltage laboratory, the<br />
per<strong>for</strong>mance of several tests to determine the state of<br />
electric equipment, particularly circuit breakers,<br />
trans<strong>for</strong>mer crossbars, chains of insulators protected<br />
by silicone rubber, among others. Electrical and<br />
mechanical parameters were also monitored to<br />
determine the interaction between wind farms and the<br />
Electric Grid, and several measurement trans<strong>for</strong>mers<br />
were also overhauled;<br />
2003 - Annual Report - <strong>EDP</strong><br />
• Taking advantage of the infrared tomography<br />
equipment, aerial inspection of about 15,000 km of<br />
overhead lines, some of which in areas affected by the<br />
summer <strong>for</strong>est fires, and several measures to detect<br />
overheating of the transport and distribution networks<br />
at substations, and thermal characterisation of waters<br />
affected by the thermal power <strong>plan</strong>t cooling outlets;<br />
• Development of an area dedicated to the study of<br />
electricity networks and protection systems. For the<br />
purpose young technical staff of great potential were<br />
recruited and were given advanced training and<br />
provided with state-of-the-art calculation tools; and<br />
• Consultants of recognised national and international<br />
merit, were hired to support the start-up of these<br />
activities, allowing the Group’s internal and external<br />
customers to be provided with quality service in the<br />
areas of electricity network per<strong>for</strong>mance and<br />
dimensioning, with a special focus on the quality of<br />
the service.