equired by <strong>EDP</strong>. The three generating units are<br />

programmed to come on stream in May, July and<br />

October 2006.<br />

• Couto Magalhães<br />

The Couto Magalhães hydroelectric power station (150<br />

MW installed capacity), in which <strong>EDP</strong> has a 49% stake<br />

and the Rede Group 51%, is not yet past the<br />

environmental (EIS/RIMA), energy and engineering<br />

studies stage to determine the final characteristics of<br />

Distribution Business<br />

Number of Customers<br />

<strong>EDP</strong> Group in Brazil<br />

2003 - Annual Report - <strong>EDP</strong><br />

the undertaking. Work has now been suspended in<br />

view of the new environmental requests made by the<br />

authorities – not included in the concession contract –<br />

which would substantially increase the costs of the<br />

project and cause delays that could compromise the<br />

economic feasibility of the undertaking.<br />

There<strong>for</strong>e, the Ener-Rede Couto Magalhães Consortium<br />

has asked ANEEL to <strong>for</strong>malise the amicable rescission<br />

of the concession contract. The position of the regulator<br />

on this matter is still awaited.<br />

• Feasibility studies of new hydroelectric <strong>plan</strong>ts<br />

The feasibility study of the Ipueiras hydroelectric<br />

power station has been concluded and the decision of<br />

the authorities in respect of the licensing process<br />

covered by this study is awaited. Also awaited is the<br />

decision by the environmental authority allowing the<br />

conclusion of the environmental studies in respect of<br />

the Tupirantins hydroelectric <strong>plan</strong>t. Studies concluded<br />

and approved by the authorities may lead to the power<br />

station concession being offered by public auction. By<br />

drawing up these studies <strong>EDP</strong> will be entitled to bid in<br />

the auction or to be reimbursed in respect of the costs of<br />

the feasibility study.<br />

Bandeirante Escelsa Enersul Total<br />

2003 2002 Var. % 2003 2002 Var. % 2003 2002 Var. % 2003 2002 Var. %<br />

Total Customers 1 320 211 1 297 285 1.8% 968 165 954 381 1.4% 613 832 596 569 2.9% 2 902 208 2 848 235 1.9%<br />

Residential 1 210 721 1 184 016 2.3% 764 264 756 409 1.0% 503 544 489 211 2.9% 2 478 529 2 429 636 2.0%<br />

Industrial 7 620 9 303 (18.1%) 10 633 11 069 (3.9%) 4 451 4 686 (5.0%) 22 704 25 058 (9.4%)<br />

Commercial 86 510 88 594 (2.4%) 85 465 84 460 1.2% 53 279 52 354 1.8% 225 254 225 408 (0.1%)<br />

Other 15 360 15 372 (0.1%) 107 803 102 443 5.2% 52 558 50 318 4.5% 175 721 168 133 4.5%<br />

Sales<br />

<strong>EDP</strong> Group in Brazil GWh<br />

Bandeirante Escelsa Enersul Total<br />

2003 2002 Var. % 2003 2002 Var. % 2003 2002 Var. % 2003 2002 Var. %<br />

Bought in & own-generation<br />

electricity 11 236 13 872 (19.0%) 7 237 8 343 (13.3%) 3 449 3 704 (6.9%) 21 922 25 919 (15.4%)<br />

Electricity entering distribution 12 389 11 804 5.0% 8 184 7 337 11.6% 3 390 3 270 3.7% 23 964 22 411 6.9%<br />

Losses in distribution (1 009) (886) (13.9%) (997) (838) (19.0%) (533) (516) (3.4%) (2 539) (2 240) (13.4%)<br />

Sales to customers 9 543 10 165 (6.1%) 5 900 6 365 (7.3%) 2 816 2 754 2.2% 18 260 19 284 (5.3%)<br />

Residential 2 132 2 115 0.8% 1 195 1 134 5.5% 872 863 1.1% 4 200 4 111 2.2%<br />

Industrial 5 227 5 991 (12.8%) 2 745 3 290 (16.6%) 654 671 (2.5%) 8 626 9 952 (13.3%)<br />

Commercial 1 180 1 130 4.4% 754 839 (10.2%) 547 527 3.7% 2 481 2 497 (0.6%)<br />

Other 1 004 929 8.1% 1 206 1 102 9.4% 743 693 7.1% 2 953 2 724 8.4%<br />

Deliveries to access customers 1 837 753 144.0% 1 287 134 860.4% 41 0 - 3 165 887 256.8%<br />

Sales to MAE (1) 282 1 668 (83.1%) 46 587 (92.2%) 16 272 (94.3%) 343 2 527 (86.4%)<br />

(1) Wholesale energy market