Water storage in the reservoirs remained high during the<br />
first half of the year, then decreasing up to the end of the<br />
year to stand at 1 561 GWh at the end of December (21%<br />
less than in 2002), or about 65% of maximum capacity.<br />
With regard to service quality, the CPPE power stations<br />
continued to provide high availability levels, standing in<br />
2003 at 96.8% <strong>for</strong> the hydroelectric and 92.7% <strong>for</strong> the<br />
thermoelectric power stations.<br />
Power Station Availability (CPPE)<br />
Binding Producers<br />
95.1 95.0<br />
93.0<br />
4.0<br />
93.2<br />
4.2<br />
94.8<br />
94.6<br />
Additionally we draw attention to the following facts in<br />
the SEP generation activity:<br />
5.8<br />
• The conclusion on June 30 of the extension of the CAE<br />
of the Alto da Mira Power Station, and the signature by<br />
CPPE and REN of the respective Handing-over<br />
Certificate. Mention is also made to the prorogation of<br />
the CAE of Groups 1 and 2 of the Tunes Power Station<br />
up to December <strong>2004</strong>;<br />
• Conclusion of the modernisation of the groups of the<br />
Castelo do Bode Power Station, the oldest hydroelectric<br />
<strong>plan</strong>t, allowing it to restart a new cycle of useful life<br />
with a reliability equivalent to that of a new <strong>plan</strong>t;<br />
• Submission to the DGE of the final documents in<br />
respect of the Environmental Impact Study (EIS) of<br />
the Comparative Evaluation of the Plans of the<br />
95.9<br />
94.4<br />
96.8<br />
92.7<br />
1999 2000 2001 2002 2003<br />
Hydraulic Availability (%)<br />
MW / Worker<br />
6.4<br />
6.3<br />
Thermal Availability (%)<br />
2003 - Annual Report - <strong>EDP</strong><br />
Hydroelectric Power Stations of the Baixo Sabor and<br />
Alto Côa, and start of the work of the Evaluation<br />
Commission, which issued the EIA con<strong>for</strong>mity<br />
declaration leading to the public hearing stage on<br />
December 30;<br />
• Continuation of the construction of the Increase of<br />
Power at Venda Nova (Venda Nova II Undertaking),<br />
the construction work to be concluded during the early<br />
months of <strong>2004</strong>, despite some constraints that appeared<br />
in the hydraulic circuit and in the <strong>plan</strong>t, which have<br />
obliged several adaptations in setting up the reversible<br />
groups;<br />
• The publication of CPPE’s role in flood management in<br />
conjunction with the National Civil Defence Service<br />
and INAG (the Water Institute), namely: two<br />
in<strong>for</strong>mation sessions held at the Régua Telecommand<br />
Centre, the first directed at the Régua Commercial and<br />
Industrial Association and local media, and the second<br />
to national media; participation in the public and<br />
restricted sessions organised by the Oporto Civil<br />
Government concerning this matter; and in<strong>for</strong>mation<br />
sessions held at the Alto Lindoso power station<br />
directed at the Civil Defence Services of the district of<br />
Viana do Castelo and at the municipalities of Ponte da<br />
Barca and Ponte de Lima.<br />
Non Binding Generation<br />
• Hydroelectric power stations in operation<br />
During 2003 at HDN and Hidrocenel, which operate<br />
the hydroelectric power stations of the <strong>EDP</strong> Group that<br />
were integrated into CPPE on January 2, <strong>2004</strong> attention<br />
is drawn to the following:<br />
a) their operation jointly with <strong>EDP</strong> Energia within the<br />
scope of the SENV, with the status of offering agents on<br />
the basis of a mandate contract that establishes the<br />
electricity purchase and sale conditions, the<br />
remuneration of power provided and the programming<br />
and dispatch model of power stations with a power of<br />
more than 10 MW;<br />
b) the application lodged with the DGE to issue a new<br />
hydroelectric generation license covering the transition<br />
of the Lindoso and Ermal hydroelectric power stations<br />
from the SENV, to the specific legislation governing the<br />
Special Production Regime.<br />
For this segment of the <strong>business</strong> total installed capacity<br />
at HDN is 80 MW and at Hidrocenel 94 MW, with a<br />
total of 255 MW at the level of the <strong>EDP</strong> Group, with the<br />
inclusion of <strong>EDP</strong> Ernergia’s Belver hydroelectric power<br />
station.<br />
The net generation figures <strong>for</strong> HDN and Hidrocenel<br />
totalled 121 GWh and 288 GWh, an increase of 34.8%<br />
and 29.6% respectively. The net production of <strong>EDP</strong><br />
Energia in the SENV was 296 GWh, 167.0% more than<br />