Water storage in the reservoirs remained high during the<br />

first half of the year, then decreasing up to the end of the<br />

year to stand at 1 561 GWh at the end of December (21%<br />

less than in 2002), or about 65% of maximum capacity.<br />

With regard to service quality, the CPPE power stations<br />

continued to provide high availability levels, standing in<br />

2003 at 96.8% <strong>for</strong> the hydroelectric and 92.7% <strong>for</strong> the<br />

thermoelectric power stations.<br />

Power Station Availability (CPPE)<br />

Binding Producers<br />

95.1 95.0<br />

93.0<br />

4.0<br />

93.2<br />

4.2<br />

94.8<br />

94.6<br />

Additionally we draw attention to the following facts in<br />

the SEP generation activity:<br />

5.8<br />

• The conclusion on June 30 of the extension of the CAE<br />

of the Alto da Mira Power Station, and the signature by<br />

CPPE and REN of the respective Handing-over<br />

Certificate. Mention is also made to the prorogation of<br />

the CAE of Groups 1 and 2 of the Tunes Power Station<br />

up to December <strong>2004</strong>;<br />

• Conclusion of the modernisation of the groups of the<br />

Castelo do Bode Power Station, the oldest hydroelectric<br />

<strong>plan</strong>t, allowing it to restart a new cycle of useful life<br />

with a reliability equivalent to that of a new <strong>plan</strong>t;<br />

• Submission to the DGE of the final documents in<br />

respect of the Environmental Impact Study (EIS) of<br />

the Comparative Evaluation of the Plans of the<br />

95.9<br />

94.4<br />

96.8<br />

92.7<br />

1999 2000 2001 2002 2003<br />

Hydraulic Availability (%)<br />

MW / Worker<br />

6.4<br />

6.3<br />

Thermal Availability (%)<br />

2003 - Annual Report - <strong>EDP</strong><br />

Hydroelectric Power Stations of the Baixo Sabor and<br />

Alto Côa, and start of the work of the Evaluation<br />

Commission, which issued the EIA con<strong>for</strong>mity<br />

declaration leading to the public hearing stage on<br />

December 30;<br />

• Continuation of the construction of the Increase of<br />

Power at Venda Nova (Venda Nova II Undertaking),<br />

the construction work to be concluded during the early<br />

months of <strong>2004</strong>, despite some constraints that appeared<br />

in the hydraulic circuit and in the <strong>plan</strong>t, which have<br />

obliged several adaptations in setting up the reversible<br />

groups;<br />

• The publication of CPPE’s role in flood management in<br />

conjunction with the National Civil Defence Service<br />

and INAG (the Water Institute), namely: two<br />

in<strong>for</strong>mation sessions held at the Régua Telecommand<br />

Centre, the first directed at the Régua Commercial and<br />

Industrial Association and local media, and the second<br />

to national media; participation in the public and<br />

restricted sessions organised by the Oporto Civil<br />

Government concerning this matter; and in<strong>for</strong>mation<br />

sessions held at the Alto Lindoso power station<br />

directed at the Civil Defence Services of the district of<br />

Viana do Castelo and at the municipalities of Ponte da<br />

Barca and Ponte de Lima.<br />

Non Binding Generation<br />

• Hydroelectric power stations in operation<br />

During 2003 at HDN and Hidrocenel, which operate<br />

the hydroelectric power stations of the <strong>EDP</strong> Group that<br />

were integrated into CPPE on January 2, <strong>2004</strong> attention<br />

is drawn to the following:<br />

a) their operation jointly with <strong>EDP</strong> Energia within the<br />

scope of the SENV, with the status of offering agents on<br />

the basis of a mandate contract that establishes the<br />

electricity purchase and sale conditions, the<br />

remuneration of power provided and the programming<br />

and dispatch model of power stations with a power of<br />

more than 10 MW;<br />

b) the application lodged with the DGE to issue a new<br />

hydroelectric generation license covering the transition<br />

of the Lindoso and Ermal hydroelectric power stations<br />

from the SENV, to the specific legislation governing the<br />

Special Production Regime.<br />

For this segment of the <strong>business</strong> total installed capacity<br />

at HDN is 80 MW and at Hidrocenel 94 MW, with a<br />

total of 255 MW at the level of the <strong>EDP</strong> Group, with the<br />

inclusion of <strong>EDP</strong> Ernergia’s Belver hydroelectric power<br />

station.<br />

The net generation figures <strong>for</strong> HDN and Hidrocenel<br />

totalled 121 GWh and 288 GWh, an increase of 34.8%<br />

and 29.6% respectively. The net production of <strong>EDP</strong><br />

Energia in the SENV was 296 GWh, 167.0% more than<br />

in 2002.