12.07.2015 Views

Conventional Systems Technical Manual - Alcad

Conventional Systems Technical Manual - Alcad

Conventional Systems Technical Manual - Alcad

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PLACE AND HEIGHT OF PANEL POSITIONChoose a place for the surface wall-mounted box so that,when the entrance panel is fitted, rain, sun rays or strong lightsources do not adversely affect the video unit. In this way youwill avoid certain undesired problems with video door entrysystems with the visualisation of images such as the ghostingeffect caused by strong background light; correct positioningwill also preserve the working life of the equipment.Remember to pass the cables through the cable holes beforefitting the surface wall-mounted box.Fix the box to the wall using the wall-plugs and screws provided.Place it vertically and in such a way that the top part isat a height of 1.7m from floor level.1.7 m1.7 mAngular models107

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!