12.07.2015 Views

Methods in Anopheles Research - MR4

Methods in Anopheles Research - MR4

Methods in Anopheles Research - MR4

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 1 : Insectary Operation1.5 Insectary Manager ResponsibilitiesPage 2 of 6staff is <strong>in</strong>structed to ma<strong>in</strong>ta<strong>in</strong> the cleanl<strong>in</strong>ess of the floor and other areas with<strong>in</strong> their responsibility. TheVRM is responsible for cleanl<strong>in</strong>ess but is not to become the custodian.9. Air filtration is <strong>in</strong>stalled and ma<strong>in</strong>ta<strong>in</strong>ed properly to reduce the level of odors, fungi, dust, hair etc.Install<strong>in</strong>g additional equipment or modify<strong>in</strong>g exist<strong>in</strong>g equipment is considered to improve the airquality. Mold grow<strong>in</strong>g on mosquitoes and the <strong>in</strong>sectary walls can be reduced by consistent attention toelim<strong>in</strong>at<strong>in</strong>g spores. Centralized UV sterilization of the air may be feasible.10. Ensure that documentation of the ma<strong>in</strong>tenance of the emergency generator is available and be<strong>in</strong>gma<strong>in</strong>ta<strong>in</strong>ed. Notify the PI <strong>in</strong> the event of any planned power outage.Infrastructure ImprovementsThe VRM shall ensure that...1. Sign-holders are <strong>in</strong>stalled that conta<strong>in</strong> <strong>in</strong>formation about specific courses of action to take <strong>in</strong> the eventof various environmental anomalies. These will be located either near the alarms and/or by eachdoorway.2. Signage is current and attractively ma<strong>in</strong>ta<strong>in</strong>ed.3. All <strong>in</strong>frastructure and environmental changes are consistent with the <strong>MR4</strong> objectives. Furthermore,these changes are approved by all <strong>in</strong>sectary users.Infrastructure Ma<strong>in</strong>tenanceThe VRM shall ensure that...1. Hallways are kept clear of trash, boxes, unused carts, old equipment etc.2. All lights function. The ma<strong>in</strong>tenance personnel should be notified <strong>in</strong> the event of lights burn<strong>in</strong>g out andother electrical problems.3. Timers are properly set and ma<strong>in</strong>ta<strong>in</strong>ed.4. Hallway and <strong>in</strong>sectary walls are kept clean and free of un-necessary notes, tape, scuffs, holes, tacksetc.Insectary SuppliesThe VRM shall ensure that...1. Consumables required for the operation of the <strong>in</strong>sectary are ma<strong>in</strong>ta<strong>in</strong>ed at sufficient levels thatshortages do not occur. The supply should be supplemented long before the need becomes critical.Allowance should be made for shipp<strong>in</strong>g delays and <strong>in</strong>correct or <strong>in</strong>complete orders.2. Establish m<strong>in</strong>imum levels of supplies at which orders will be placed.3. Ma<strong>in</strong>ta<strong>in</strong> <strong>in</strong>ventory <strong>in</strong>formation sufficiently to ensure above.4. Consumables are safe, and have no characteristics that are an immediate threat to the mosquitostocks.5. Alternative consumables are considered for use. Materials that save time and/or money are soughtand tested.6. Ma<strong>in</strong>ta<strong>in</strong> the cleanl<strong>in</strong>ess and order of the storage areas.7. Mosquito food and blood sources are safe and of an adequate amount to ensure that shortages do notoccur.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!