13.07.2015 Views

Advances in Water Treatment and Enviromental Management

Advances in Water Treatment and Enviromental Management

Advances in Water Treatment and Enviromental Management

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PLANT MONITORING AND CONTROL SYSTEMS 101to express <strong>in</strong>terest. The pre-qualifications <strong>in</strong>cluded a first stage questionnaireidentify<strong>in</strong>g broad technical <strong>and</strong> commercial suitability. This was followedby a second more rigorous review of technical capability <strong>and</strong> quality systemswhich <strong>in</strong>volved visits to the c<strong>and</strong>idate’s premises <strong>and</strong> <strong>in</strong>spection of theirpractices <strong>and</strong> procedures. Also client <strong>and</strong> credit references were taken upfrom the potential suppliers.Pre-qualification resulted <strong>in</strong> a tender list of five <strong>and</strong> a tender specificationfor the Southern Telemetry Area (STA) PMCS Telemetry System was released<strong>in</strong> August 1989 with a period of 2 months for response.Evaluation of the five received tenders <strong>in</strong>volved assessment of the technicalcompliance together with the analysis of the f<strong>in</strong>ancial implications of variouslevels of def<strong>in</strong>ite <strong>and</strong> optional work. These levels were def<strong>in</strong>ed by the siteaudits completed to date, <strong>and</strong> schedules of anticipated procurement to beclarified dur<strong>in</strong>g the rema<strong>in</strong>der of the audit programme. To compare theseaspects of the bids a number of models of the f<strong>in</strong>al priced configurationwere established rang<strong>in</strong>g from the m<strong>in</strong>imum expected to the maximumanticipated expansion. These models took <strong>in</strong>to account the cost of ownershipwhich <strong>in</strong>cluded ma<strong>in</strong>tenance software licences <strong>and</strong> expansion costs. With<strong>in</strong>this range the mix of outstation types was varied to reflect the uncerta<strong>in</strong>ty<strong>in</strong> the outcome of the <strong>in</strong>complete audit activities. This process allowed thebids to be compared, costs assessed <strong>and</strong> the implications of the costs onthe procurement strategy to be evaluated.Aris<strong>in</strong>g from the telemetry specification <strong>and</strong> the tender returns for theSouthern Area, the technical solution offered is of high quality provid<strong>in</strong>g asystem able to meet the needs of the District Managers. Potential existswith the technical solution for expansion <strong>and</strong> enhancements without majorimplications to the PMCS <strong>in</strong>vestment. The system provides a variety offunctionality <strong>in</strong> outstation types <strong>in</strong>clud<strong>in</strong>g the use of third-party outstations.Five district centres are served by two telemetry computer centres us<strong>in</strong>g ahighly resilient configuration. Provision exists with<strong>in</strong> the system for the<strong>in</strong>tegration of local, on-site SCADA <strong>and</strong> control systems compatible withthe PMCS <strong>and</strong> to a def<strong>in</strong>ed price offered as part of the PMCS telemetrycontract. The analysis <strong>and</strong> def<strong>in</strong>ition of the <strong>in</strong>terface to operationalmanagement systems is <strong>in</strong>cluded as an option of the contract.Prequalifications similar to the telemetry tender exercise took place to securea select list of potential <strong>in</strong>strumentation <strong>and</strong> electrical contractors. Aga<strong>in</strong>steach project 6 bidders were selected to competitively tender for the project.The implementation programme required that a significant proportion ofsites be completed prior to the telemetry system delivery <strong>and</strong> sett<strong>in</strong>g towork. Thus a progressive approach to site <strong>in</strong>stallation, test<strong>in</strong>g <strong>and</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!