Advances in Water Treatment and Enviromental Management
Advances in Water Treatment and Enviromental Management
Advances in Water Treatment and Enviromental Management
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PLANT MONITORING AND CONTROL SYSTEMS 101to express <strong>in</strong>terest. The pre-qualifications <strong>in</strong>cluded a first stage questionnaireidentify<strong>in</strong>g broad technical <strong>and</strong> commercial suitability. This was followedby a second more rigorous review of technical capability <strong>and</strong> quality systemswhich <strong>in</strong>volved visits to the c<strong>and</strong>idate’s premises <strong>and</strong> <strong>in</strong>spection of theirpractices <strong>and</strong> procedures. Also client <strong>and</strong> credit references were taken upfrom the potential suppliers.Pre-qualification resulted <strong>in</strong> a tender list of five <strong>and</strong> a tender specificationfor the Southern Telemetry Area (STA) PMCS Telemetry System was released<strong>in</strong> August 1989 with a period of 2 months for response.Evaluation of the five received tenders <strong>in</strong>volved assessment of the technicalcompliance together with the analysis of the f<strong>in</strong>ancial implications of variouslevels of def<strong>in</strong>ite <strong>and</strong> optional work. These levels were def<strong>in</strong>ed by the siteaudits completed to date, <strong>and</strong> schedules of anticipated procurement to beclarified dur<strong>in</strong>g the rema<strong>in</strong>der of the audit programme. To compare theseaspects of the bids a number of models of the f<strong>in</strong>al priced configurationwere established rang<strong>in</strong>g from the m<strong>in</strong>imum expected to the maximumanticipated expansion. These models took <strong>in</strong>to account the cost of ownershipwhich <strong>in</strong>cluded ma<strong>in</strong>tenance software licences <strong>and</strong> expansion costs. With<strong>in</strong>this range the mix of outstation types was varied to reflect the uncerta<strong>in</strong>ty<strong>in</strong> the outcome of the <strong>in</strong>complete audit activities. This process allowed thebids to be compared, costs assessed <strong>and</strong> the implications of the costs onthe procurement strategy to be evaluated.Aris<strong>in</strong>g from the telemetry specification <strong>and</strong> the tender returns for theSouthern Area, the technical solution offered is of high quality provid<strong>in</strong>g asystem able to meet the needs of the District Managers. Potential existswith the technical solution for expansion <strong>and</strong> enhancements without majorimplications to the PMCS <strong>in</strong>vestment. The system provides a variety offunctionality <strong>in</strong> outstation types <strong>in</strong>clud<strong>in</strong>g the use of third-party outstations.Five district centres are served by two telemetry computer centres us<strong>in</strong>g ahighly resilient configuration. Provision exists with<strong>in</strong> the system for the<strong>in</strong>tegration of local, on-site SCADA <strong>and</strong> control systems compatible withthe PMCS <strong>and</strong> to a def<strong>in</strong>ed price offered as part of the PMCS telemetrycontract. The analysis <strong>and</strong> def<strong>in</strong>ition of the <strong>in</strong>terface to operationalmanagement systems is <strong>in</strong>cluded as an option of the contract.Prequalifications similar to the telemetry tender exercise took place to securea select list of potential <strong>in</strong>strumentation <strong>and</strong> electrical contractors. Aga<strong>in</strong>steach project 6 bidders were selected to competitively tender for the project.The implementation programme required that a significant proportion ofsites be completed prior to the telemetry system delivery <strong>and</strong> sett<strong>in</strong>g towork. Thus a progressive approach to site <strong>in</strong>stallation, test<strong>in</strong>g <strong>and</strong>