13.07.2015 Views

Advances in Water Treatment and Enviromental Management

Advances in Water Treatment and Enviromental Management

Advances in Water Treatment and Enviromental Management

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OPTIMISING PUMPING PLANT OPERATION 115FIG. 15 RESERVOIR LEVEL PROFILES [STUDY 2]6 CONCLUSIONSAlthough primarily <strong>in</strong>tended to demonstrate BHRGroup’s <strong>in</strong>novative approach to pumpschedul<strong>in</strong>g, PUMPLAN has already proved itself as a useful tool <strong>in</strong> commercial applications.The KBS approach allows the possibility of extremely advanced decision support software tobe considered that will be capable of advis<strong>in</strong>g on a much wider range of unplanned situationsthan had previously been thought feasible.The philosophy that it is more important to f<strong>in</strong>d an operationally good schedule that has beenbased on rigorous network analysis than to f<strong>in</strong>d a mathematical optimum, based on a lessaccurate network model, helps to overcome some of the drawbacks <strong>in</strong>herent <strong>in</strong> the softwarepresently available.REFERENCES1] MJ.Likeman, T.J.M.Moore “A Knowledge Based Approach to Pump Schedul<strong>in</strong>g” BHRGroup 1990.2] TJ.M.Moore, P.N.Smith “Methods of Assess<strong>in</strong>g <strong>and</strong> Reduc<strong>in</strong>g the Cost of <strong>Water</strong> Supply Pump<strong>in</strong>g”BHRGroup Report N° RR3207 Jan 1990.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!